BHP GROUP LIMITED - Quarterly Activities Report

Release Date: 20/10/2026 09:20
Code(s): BHG     PDF:  
Wrap Text
Quarterly Activities Report

BHP Group Limited  
BHP Group Limited ABN 49 004 028 077  
Registered in Australia  
Registered Office: Level 18, 171 Collins Street Melbourne VIC 3000  
Share code: BHG  
ISIN: AU000000BHP4  
                                                           20 October 2026

Operational review for the quarter ended 30 September 2026

Safety a key focus; strong price realisation with no change to production
guidance.

"The deaths of two colleagues at Escondida and Peak Downs are a profound loss.
Our thoughts remain with their families and friends. No loss of life is
acceptable. Investigations are underway and we will keep strengthening the
controls that keep people safe in our pursuit of being a fatality free
business.

Copper production was lower in the first quarter, reflecting planned grade
declines and scheduled maintenance, alongside temporary disruptions from severe
weather in Chile, stops for safety and the conveyor failure at Carrapateena.
Our bulk commodities delivered a strong start to FY27 through a
maintenance-intensive quarter. WAIO set records at both the mine and port, while
BMA and NSW Energy Coal both delivered higher production than the same period
last year. Stronger commodity prices provided a tailwind for earnings, particularly in
copper where prices were around 50 per cent higher than a year ago. 

We are building the next phase of growth in copper and potash. We continued to
strengthen one of the world's largest copper portfolios, from funding the
Escondida New Concentrator in Chile to growing our resource base and long-term
production potential at Copper South Australia, while also expanding our copper
growth pipeline across the Americas. Jansen is rapidly taking shape, with Stage
1 now 87 per cent complete and on track for first production in mid-2027, adding
a new and important commodity to our portfolio.

Global markets remain volatile, with geopolitical tensions, trade uncertainty
and elevated energy and freight costs continuing to create headwinds across the
industry. At the same time, demand for commodities remains resilient, supported
by continued industrialisation and urbanisation in China and India, alongside
unprecedented investment in data centres and enabling infrastructure globally,
which is reinforcing the long-term outlook for copper. That demand plays to the
strength of our portfolio, which touches almost every part of how the world
builds, powers and feeds itself."

                                      Brandon Craig, BHP Chief Executive Officer

Summary
---------------------------------------------------------------------------------------------------------------------------------
Operational excellence                                            Copper growth

Full year guidance remains unchanged                              Progressing our organic growth options

Copper production decreased due to lower planned concentrator
feed grades and operational disruptions across our assets
including planned maintenance and severe weather in Chile.

Our bulk commodities delivered a strong start to the year.        We are advancing our strategy to grow Copper SA's copper
WAIO increased production 4% during a period of significant       production to ~500ktpa by 2035 and up to 650ktpa by 2040 and
planned maintenance, demonstrating the strength and resilience    today we announced an increase to Olympic Dam's mineral
of our integrated supply chain. Production at BMA was also        resource base. At our November site visit, we will provide
strong reflecting improved operating performance, while           further detail regarding our strategy. We also renamed the Oak
NSWEC's production increased due to higher bypass coal.       	  Dam exploration project 'Ankata' in recognition of the
                                                                  cultural significance of the area to the Kokatha people.

							          At Escondida, US$0.8 bn (100% basis) of pre-commitment funding
								  was approved to enable execution readiness for the Escondida
                                                                  New Concentrator and we remain on track to deliver first
                                                                  potash production at our Jansen project in mid-CY27.
---------------------------------------------------------------------------------------------------------------------------------
Strategic partnerships                                            Social value

Supporting growth                                                 Building long-term, sustainable value

In September, BHP signed an MOU with KGHM Polska Miedz S.A.       In July 2026, BMA became BHP’s first operated Australian asset 
(55% owner of Sierra Gorda) to explore opportunities for both     to reach 100% renewable electricity, based on current forecast
parties to collaborate and unlock synergy value at Spence and     demand. We also partnered with Amazon Web Services (AWS) on an industry-first
Sierra Gorda. The focus areas of collaboration include            pilot to sell credits to AWS for lower greenhouse-emissions associated with copper from
technical expertise, exploration and future development           Escondida, helping to develop a market-based mechanism that
projects.                                                         connects lower-emissions copper production with customer
                                                                  demand.
We also completed a transaction with Faraday to divest BHP's
San Manuel legacy asset and increase BHP's interest in the        In September, we held our ESG Roundtable covering safety,
emerging US copper developer to 32% (non-diluted basis).          operational decarbonisation, climate and social value.
---------------------------------------------------------------------------------------------------------------------------------

                                                   Quarter performance           Production guidance
                                              ----------------------------- -----------------------------
Production                                     Q1 FY27  v Q4 FY26 v Q1 FY26  FY27 guidance
--------------------------------------------- --------- --------- --------- --------------
Copper (kt)..................................     400.7   (19%)     (19%)    1,650 - 1,800
   Escondida (kt)............................     252.6   (19%)     (23%)    1,000 - 1,100      Unchanged
   Pampa Norte (Spence) (kt).................      47.4   (13%)     (15%)        210 - 230      Unchanged
   Copper South Australia (kt)...............      60.7   (33%)     (16%)        290 - 320      Unchanged
   Antamina (kt).............................      40.0    13%       18%         120 - 140      Unchanged
Iron ore (Mt)................................      66.5    (2%)       4%         260 - 272
   WAIO (Mt).................................      64.3    (3%)       4%         253 - 264      Unchanged
   WAIO (100% basis) (Mt)....................      71.9    (4%)       2%         286 - 298      Unchanged
   Samarco (Mt)..............................       2.2    10%        4%         7.5 - 8.0      Unchanged
Steelmaking coal - BMA (Mt)..................       4.9   (13%)       1%       18.5 - 20.5
   BMA (100% basis) (Mt).....................       9.8   (13%)       1%           37 - 41      Unchanged
Energy coal - NSWEC (Mt).....................       4.4     6%       26%           14 - 16      Unchanged

--------------------------------------------------------------------------------
                         BHP | Financial results for the year ended 30 June 2026

Segment and asset performance | FY27 YTD v FY26 YTD

--------------------------------------------------------------------------------------------------------------
[GRAPHIC]  Further information in Appendix 1

           Detailed production and sales information for all operations in Appendix 2

--------------------------------------------------------------------------------------------------------------

Copper

Production                     Total copper production decreased 19% to 401 kt. Copper production guidance for
                               FY27 remains unchanged at between 1,650 and 1,800 kt.
401 kt Down 19%
                               Escondida 252.6 kt  Down 23% (100% basis)
Q1 FY26 494 kt
                               A fatal incident involving one of our employees occurred at Escondida on 23
FY27e 1,650 - 1,800 kt         September. An investigation is underway and we are working closely with local
                               authorities.

Average realised price         Production decreased due to lower concentrate production, reflecting planned
                               lower feed grade of 0.81% (Q1 FY26: 0.94%) and scheduled maintenance in the
US$7.01/lb Up 53%              quarter. The fatal incident also led to a temporary suspension of all mining
                               activities and severe weather in July and August constrained operational
Q1 FY26 US$4.59/lb             logistics and truck fleet utilisation. Cathode production increased, supported
                               by higher Full SaL recoveries and improved sulphide leaching performance.

                               A new collective agreement with Union N°2 of Supervisors was signed and became 
                               effective for 36 months from 14 October 2026.

                               Production guidance for FY27 remains unchanged at between 1,000 and 1,100 kt.
                               Concentrator feed grade guidance of ~0.70% for the full year also remains
                               unchanged.

                               We continue to make progress on the Escondida Growth Program, with US$0.8 bn
                               (100% basis) of pre-commitment funding approved to enable further engineering,
                               permitting and execution readiness for the Escondida New Concentrator.

                              
                               Pampa Norte (Spence) 47.4 kt  Down  15%

                               Production decreased due to lower concentrate production, reflecting planned
                               lower feed grade of 0.53% (Q1 FY26: 0.65%) and ongoing challenges in managing
                               ore variability. Progress continues towards first production from the
                               Concentrator Upgrade Recovery project in FY28 and the Spence Chalcopyrite
                               Leaching project in CY28.

                               Production guidance for FY27 remains unchanged at between 210 and 230 kt, with
                               volumes weighted to the second half.

                               Copper South Australia 60.7 kt  Down  16%

                               Production decreased primarily due to the underground conveyor belt failure at
                               Carrapateena, disclosed with the FY26 results. A replacement belt was installed
                               and was operational within seven weeks, followed by a progressive ramp-up
                               through September. The conveyor is now operating at full capacity. Olympic Dam
                               started to build anode inventory as planned ahead of the Smelter Campaign
                               Maintenance 27 program (scheduled for H1 FY28).

                               At Prominent Hill, concentrate sales were higher than production during the
                               quarter, reflecting the drawdown of inventory built up in H2 FY26.

                               Production guidance for FY27 remains unchanged at between 290 and 320 kt.

                               Other copper

                               At Antamina, copper production increased 18% to 40 kt as a result of planned
                               higher feed grades and strong operational performance. Zinc production
                               decreased 70% to 11 kt, as a result of planned lower feed grades.

                               FY27 copper production guidance of between 120 and 140 kt and zinc production
                               guidance of between 35 and 55 kt remain unchanged.
                                       
--------------------------------------------------------------------------------
                         BHP | Financial results for the year ended 30 June 2026

--------------------------------------------------------------------------------------------------------------

Iron ore

Production                     Iron ore production increased 4% to 66.5 Mt. Production guidance for FY27
                               remains unchanged at between 260 and 272 Mt.
66 Mt Up 4%
                               WAIO 64.3 Mt  Up 4% | 71.9 Mt (100% basis)
Q1 FY26 64 Mt
                               Production increased as a result of strong operational performance across our
FY27e 260 - 272 Mt             mine, rail and port operations, in a quarter of significant planned maintenance,
                               with Q1 records achieved at both the mine and port.

Average realised price         We are currently undertaking a major rebuild of Car Dumper 4 at Port Hedland,
                               which had a 1.4 Mt (100% basis) volume impact in Q1. The project is progressing
US$76.27/wmt  Down  9%         well, at ~40% complete and remains on track for completion in H1 FY27.

Q1 FY26 US$84.04/wmt           We are also making strong progress on our investments to deliver production of
                               >305Mt by the end of FY28. The sixth car dumper (CD6) is on track for completion
                               in Q4 FY28. Once operational, we expect CD6 will assist in offsetting the
                               production impact from major car dumper renewals beginning in FY29, while also
                               enhancing ore blending and screening capability at the port. The Western Ridge
                               Crusher project remains on track, with first ore scheduled for H1 FY27.

                               Production guidance for FY27 remains unchanged at between 253 and 264 Mt (286
                               and 298 Mt on a 100% basis).

                               Samarco 2.2 Mt  Up 4% | 4.3 Mt (100% basis)

                               Production increased due to strong concentrator performance. Production
                               guidance for FY27 remains unchanged at between 7.5 and 8 Mt.

--------------------------------------------------------------------------------------------------------------

Coal

Steelmaking coal

Production                     BMA 4.9 Mt  Up 1% | 9.8 Mt (100% basis)

4.9 Mt Up 1%                   Production increased reflecting strong operational performance and mine
                               sequencing. BMA's focus remains on stabilising raw coal inventory levels and
Q1 FY26 4.9 Mt                 normalising strip ratio over the medium term. Operations at all mines were
                               suspended following the fatality of a team member, with mining suspended
FY27e 18.5 - 20.5 Mt           for one week at Peak Downs and 24 hours across other operations. Investigations
                               are ongoing.

Average realised price         A longwall move at Broadmeadow is scheduled to commence late in Q2 FY27.

US$242.82/t  Up 34%            Production guidance for FY27 remains unchanged at between 18.5 and 20.5 Mt (37
                               and 41 Mt on a 100% basis), with volumes weighted to the second half.
Q1 FY26 US$180.67/t

--------------------------------------------------------------------------------------------------------------

Energy coal

Production                     NSWEC 4.4 Mt  Up 26%

4.4 Mt  Up 26%                 Production increased driven by higher bypass coal as mining progressed into
                               lower strip ratio areas and improved wash plant throughput.
Q1 FY26 3.5 Mt
                               Production guidance for FY27 remains unchanged at between 14 and 16 Mt, with
FY27e 14 - 16 Mt               volumes weighted to the first half.


Average realised price

US$116.60/t  Up 23%

Q1 FY26 US$95.18/t

                                     
--------------------------------------------------------------------------------
                         BHP | Financial results for the year ended 30 June 2026

Quarterly performance | Q1 FY27 v Q4 FY26

----------------------------------------------------------------- ----------------------------------------------------------------
Copper                                                            Iron ore

401 kt Down  19%      Lower production at Escondida and Spence    66 Mt  Down 2%        Lower production at WAIO as a result of
                      due to planned lower grades, scheduled                            planned maintenance including the rebuild
Q4 FY26 492 kt        maintenance, the safety incident at         Q4 FY26 68 Mt         of Car Dumper 4.
                      Escondida and severe weather impacts.
                      Production was also lower at Copper SA due
                      to planned maintenance and the Carrapateena
                      belt rip. This was partially offset by
                      higher production at Antamina due to higher
                      concentrator throughput.

----------------------------------------------------------------- ----------------------------------------------------------------

Steelmaking coal                                                  Energy coal

4.9 Mt  Down 13%      Production decreased due to planned higher  4.4 Mt  Up 6%         Higher production due to increased bypass
                      strip ratio and scheduled maintenance.                            coal. This was supported by the completion
Q4 FY26 5.7 Mt        Operations were also impacted following the Q4 FY26 4.2 Mt        ahead of schedule of the annual wash plant
                      safety incident at Peak Downs.                                    maintenance.

----------------------------------------------------------------- ----------------------------------------------------------------

                                       
--------------------------------------------------------------------------------
                         BHP | Financial results for the year ended 30 June 2026

Appendix 1

Average realised prices/i/

                                                  Quarter
                                        ----------------------------
                                        Q1 FY27  v Q4 FY26 v Q1 FY26
--------------------------------------  -------- --------- ---------
Copper (US$/lb).......................      7.01       7%       53%
Iron ore (US$/wmt, FOB)...............     76.27      (9%)      (9%)
Steelmaking coal (US$/t)..............    242.82       4%       34%
Energy coal (US$/t)/ii/...............    116.60      (1%)      23%

i    Based on provisional, unaudited estimates. Prices exclude sales from equity
     accounted investments, third party product and internal sales, and
     represent the weighted average of various sales terms (for example: FOB,
     CIF and CFR), unless otherwise noted. Includes the impact of provisional
     pricing and finalisation adjustments.
ii   Export sales only. Includes thermal coal sales from steelmaking coal mines.

Current year unit cost guidance

Unit cost                                      FY27 guidance/i/
--------------------------------------  -----------------------------
Escondida (US$/lb)....................       1.20 - 1.50    Unchanged
Spence (US$/lb).......................       2.40 - 2.70    Unchanged
Copper South Australia (US$/lb)/ii/...       0.30 - 0.80    Unchanged
WAIO (US$/t)..........................     20.25 - 21.75    Unchanged
BMA (US$/t)...........................         126 - 137    Unchanged

i    FY27 unit cost guidance ranges are based on exchange rates of AUD/USD 0.70
     and USD/CLP 890. WAIO and BMA's FY27 unit cost guidance ranges are subject
     to movements in the diesel benchmark.
ii   Copper SA unit cost guidance is calculated using the following assumptions
     for by-products: gold US$4,300/oz and uranium US$80/lb.

Medium term guidance/i/

                                      Production          Unit cost
                                       guidance           guidance
                                  -----------------  ------------------
Escondida.......................   900 - 1,000 ktpa   US$1.30 - 1.60/lb
Spence..........................          ~235 ktpa   US$2.10 - 2.40/lb
WAIO (100% basis)...............          >305 Mtpa         <US$19.00/t
BMA (100% basis)................       43 - 45 Mtpa           <US$120/t

i    Medium-term unit cost guidance ranges are based on exchange rates of
     AUD/USD 0.70 and USD/CLP 890. Medium-term guidance target refers to an
     average between FY28 and FY31 for Escondida and Spence. At WAIO this is
     expected to be achieved in FY29 and at BMA by the end of the five-year
     medium-term horizon.

Major projects

                                                                  Estimated project
                                                                   expenditure/1/          First production
Commodity Project and ownership            Capacity                   US$M                    target date             Progress
--------- --------------------- ------------------------------ ----------------------- ------------------------ -------------------
Potash    Jansen Stage 1        Design, engineering and                       8,400    Mid-CY27                 Project is 87%
          (Canada)              construction of an underground                                                  complete
          100%                  potash mine and surface
                                infrastructure, with capacity
                                to produce 4.15 Mtpa

Potash    Jansen Stage 2        Development of additional                     6,900    Late-FY31                Project is 18%
          (Canada)              mining districts, completion                                                    complete
          100%                  of the second shaft hoist
                                infrastructure, expansion of
                                processing facilities and
                                addition of rail cars to
                                facilitate production of an
                                incremental 4.36 Mtpa

1    Includes project capital expenditure, project operating expenditure, cost
     to construct right-of-use assets (i.e. Westshore port terminal and
     third-party rail line) and related contingencies.

Exploration

Minerals exploration and evaluation expenditure was US$87 m for Q1 FY27 (Q1
FY26: US$90 m), of which US$67 m was expensed (Q1 FY26: US$76 m).

                                       
--------------------------------------------------------------------------------
                         BHP | Financial results for the year ended 30 June 2026

Appendix 2

                                                                                      Production
                                                        ----------------------------------------------------------------------
                                                                       Quarter ended                        Year to date
                                                        -------------------------------------------  -------------------------
                                                         Sep      Dec      Mar      Jun      Sep      Sep      Sep       Var
                                                         2025     2025     2026     2026     2026     2026     2025       %
                                                        -------  -------  -------  -------  -------  -------  -------  -------
Group production and sales summary                                                                                                                                                                                                                                                                                                                    
By commodity                                                                                                                                                                                                                                                                                                                                          

Metals production is payable metal unless otherwise noted. Throughout this
report figures in italics indicate that this figure has been adjusted since it
was previously reported.

Copper         Payable metal in concentrate   kt          374.0    366.5    347.7    337.6    277.0    277.0    374.0    (26%) 
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Escondida                      kt          282.4    270.5    248.3    245.6    197.9    197.9    282.4    (30%) 
               Pampa Norte (Spence)           kt           35.4     33.3     25.7     26.9     27.2     27.2     35.4    (23%) 
               Copper South Australia         kt           19.9     22.2     27.5     29.8     11.9     11.9     19.9    (40%) 
               Antamina                       kt           33.9     38.2     44.1     35.3     40.0     40.0     33.9     18% 
               Carajas/1/                     kt            2.4      2.3      2.1       --       --       --      2.4     --  
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Cathode                        kt          119.6    124.0    129.1    154.3    123.7    123.7    119.6      3% 
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Escondida                      kt           46.5     46.7     54.9     66.3     54.7     54.7     46.5     18% 
               Pampa Norte (Spence)           kt           20.4     24.4     18.9     27.6     20.2     20.2     20.4     (1%) 
               Copper South Australia         kt           52.7     52.9     55.3     60.4     48.8     48.8     52.7     (7%) 
               Total                          kt          493.6    490.5    476.8    491.9    400.7    400.7    493.6    (19%) 
                                                        -------  -------  -------  -------  -------  -------  -------  -------
Lead           Payable metal in concentrate   t             754       91      209      225       73       73      754    (90%) 
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Antamina                       t             754       91      209      225       73       73      754    (90%) 
                                                        -------  -------  -------  -------  -------  -------  -------  -------
Zinc           Payable metal in concentrate   t          35,991   27,003   17,723   15,410   10,952   10,952   35,991    (70%) 
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Antamina                       t          35,991   27,003   17,723   15,410   10,952   10,952   35,991    (70%) 
                                                        -------  -------  -------  -------  -------  -------  -------  -------
Gold           Payable metal in concentrate   troy oz    76,242   73,585  105,321   84,889   70,710   70,710   76,242     (7%) 
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Escondida                      troy oz    35,348   31,927   52,473   39,706   40,946   40,946   35,348     16% 
               Pampa Norte (Spence)           troy oz     2,589    2,724    3,800    3,595    5,379    5,379    2,589    108% 
               Copper South Australia         troy oz    36,489   36,993   47,264   41,588   24,385   24,385   36,489    (33%) 
               Carajas/1/                     troy oz     1,816    1,941    1,784       --       --       --    1,816     --  
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Refined gold                   troy oz    50,716   61,910   54,511   63,888   49,656   49,656   50,716     (2%) 
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Copper South Australia         troy oz    50,716   61,910   54,511   63,888   49,656   49,656   50,716     (2%) 
               Total                          troy oz   126,958  135,495  159,832  148,777  120,366  120,366  126,958     (5%) 
                                                        -------  -------  -------  -------  -------  -------  -------  -------
Silver         Payable metal in concentrate   troy koz    4,114    4,109    4,839    3,709    3,493    3,493    4,114    (15%) 
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Escondida                      troy koz    1,942    2,176    2,780    2,193    1,790    1,790    1,942     (8%) 
               Pampa Norte (Spence)           troy koz      358      316      375      241      356      356      358     (1%) 
               Copper South Australia         troy koz      182      179      222      219      114      114      182    (37%) 
               Antamina                       troy koz    1,632    1,438    1,462    1,056    1,233    1,233    1,632    (24%) 
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Refined silver                 troy koz      227      284      308      281      224      224      227     (1%) 
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Copper South Australia         troy koz      227      284      308      281      224      224      227     (1%) 
               Total                          troy koz    4,341    4,393    5,147    3,990    3,717    3,717    4,341    (14%) 
                                                        -------  -------  -------  -------  -------  -------  -------  -------
Uranium        Payable metal in concentrate   t             819      903      778    1,147      817      817      819      0% 
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Copper South Australia         t             819      903      778    1,147      817      817      819      0% 
                                                        -------  -------  -------  -------  -------  -------  -------  -------
Molybdenum     Payable metal in concentrate   t             341      281      341      288      599      599      341     76% 
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Pampa Norte (Spence)           t             257      269      194      163      303      303      257     18% 
               Antamina                       t              84       12      147      125      296      296       84    252% 
                                                        -------  -------  -------  -------  -------  -------  -------  -------
Iron ore       Western Australia 
                Iron Ore (WAIO)               kt         62,015   67,766   60,922   66,174   64,299   64,299   62,015      4% 
               Samarco                        kt          2,066    1,938    1,882    1,954    2,151    2,151    2,066      4% 
               Total                          kt         64,081   69,704   62,804   68,128   66,450   66,450   64,081      4% 
                                                        -------  -------  -------  -------  -------  -------  -------  -------
Steelmaking 
   coal        BHP Mitsubishi Alliance (BMA)  kt          4,865    4,291    3,816    5,654    4,913    4,913    4,865      1% 
                                                        -------  -------  -------  -------  -------  -------  -------  -------
Energy coal    NSW Energy Coal (NSWEC)        kt          3,518    4,610    4,037    4,196    4,449    4,449    3,518     26% 
                                                        -------  -------  -------  -------  -------  -------  -------  -------
1   The divestment of Carajas was completed on 2 April 2026.

                                                                                      Sales
                                                        ----------------------------------------------------------------------
                                                                       Quarter ended                        Year to date
                                                        -------------------------------------------  -------------------------
                                                         Sep      Dec      Mar      Jun      Sep      Sep      Sep       Var
                                                         2025     2025     2026     2026     2026     2026     2025       %
                                                        -------  -------  -------  -------  -------  -------  -------  -------
Group production and sales summary                                                                                                                                                                                                                                                                                                                    
By commodity                                                                                                                                                                                                                                                                                                                                          

Metals production is payable metal unless otherwise noted. Throughout this
report figures in italics indicate that this figure has been adjusted since it
was previously reported.

Copper         Payable metal in concentrate   kt          343.0    373.8    350.0    321.2    302.2    302.2    343.0    (12%)
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                        
               Escondida                      kt          258.3    277.7    252.1    233.6    210.7    210.7    258.3    (18%)
               Pampa Norte (Spence)           kt           33.2     27.9     34.9     24.4     32.2     32.2     33.2     (3%)
               Copper South Australia         kt           15.9     24.8     18.0     27.3     22.9     22.9     15.9     44%
               Antamina                       kt           33.1     40.4     43.3     35.9     36.4     36.4     33.1     10%
               Carajas/1/                     kt            2.5      3.0      1.7       --       --       --      2.5     --
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                        
               Cathode                        kt          105.9    130.7    118.7    162.1    115.1    115.1    105.9      9%
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                        
               Escondida                      kt           38.1     50.0     50.1     71.8     48.4     48.4     38.1     27%
               Pampa Norte (Spence)           kt           17.9     25.4     17.4     29.3     20.0     20.0     17.9     12%
               Copper South Australia         kt           49.9     55.3     51.2     61.0     46.7     46.7     49.9     (6%)
               Total                          kt          448.9    504.5    468.7    483.3    417.3    417.3    448.9     (7%)
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                        
Lead           Payable metal in concentrate   t           1,469      551       14      207      236      236    1,469    (84%)
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                        
               Antamina                       t           1,469      551       14      207      236      236    1,469    (84%)
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                        
Zinc           Payable metal in concentrate   t          41,499   26,046   18,573   14,703   11,413   11,413   41,499    (72%)
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                        
               Antamina                       t          41,499   26,046   18,573   14,703   11,413   11,413   41,499    (72%)
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                        
Gold           Payable metal in concentrate   troy oz    66,377   82,099   87,012   87,621   81,378   81,378   66,377     23%
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                        
               Escondida                      troy oz    35,348   31,927   52,473   39,706   40,946   40,946   35,348     16%
               Pampa Norte (Spence)           troy oz     2,589    2,724    3,800    3,595    5,379    5,379    2,589    108%
               Copper South Australia         troy oz    26,476   45,024   29,234   44,320   35,053   35,053   26,476     32%
               Carajas/1/                     troy oz     1,964    2,424    1,505       --       --       --    1,964     --
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                        
               Refined gold                   troy oz    51,147   59,054   57,336   55,962   48,038   48,038   51,147     (6%)
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                        
               Copper South Australia         troy oz    51,147   59,054   57,336   55,962   48,038   48,038   51,147     (6%)
               Total                          troy oz   117,524  141,153  144,348  143,583  129,416  129,416  117,524     10%
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                        
Silver         Payable metal in concentrate   troy koz    4,136    4,252    4,518    3,573    3,319    3,319    4,136    (20%)
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                        
               Escondida                      troy koz    1,942    2,176    2,780    2,193    1,790    1,790    1,942     (8%)
               Pampa Norte (Spence)           troy koz      358      316      375      241      356      356      358     (1%)
               Copper South Australia         troy koz      131      207      162      192      180      180      131     37%
               Antamina                       troy koz    1,705    1,553    1,201      947      993      993    1,705    (42%)
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                        
               Refined silver                 troy koz      255      250      340      249      234      234      255     (8%)
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                        
               Copper South Australia         troy koz      255      250      340      249      234      234      255     (8%)
               Total                          troy koz    4,391    4,502    4,858    3,822    3,553    3,553    4,391    (19%)
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                        
Uranium        Payable metal in concentrate   t             649      815      650    1,552      494      494      649    (24%)
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                        
               Copper South Australia         t             649      815      650    1,552      494      494      649    (24%)
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                        
Molybdenum     Payable metal in concentrate   t             347      322      263      225      500      500      347     44%
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                        
               Pampa Norte (Spence)           t             208      256      205      132      339      339      208     63%
               Antamina                       t             139       66       58       93      161      161      139     16%
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                        
Iron ore       Western Australia 
                Iron Ore (WAIO)               kt         62,430   66,909   58,608   66,430   66,306   66,306   62,430      6%
               Samarco                        kt          2,042    2,512    1,590    1,950    1,941    1,941    2,042     (5%)
               Total                          kt         64,472   69,421   60,198   68,380   68,247   68,247   64,472      6%
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                        
Steelmaking 
   coal        BHP Mitsubishi Alliance (BMA)  kt          4,472    4,413    3,852    5,905    4,821    4,821    4,472      8%
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                        
Energy coal    NSW Energy Coal (NSWEC)        kt          3,707    4,372    4,048    4,538    3,931    3,931    3,707      6%
                                                        -------  -------  -------  -------  -------  -------  -------  -------
1   The divestment of Carajas was completed on 2 April 2026.

                                       
--------------------------------------------------------------------------------
                         BHP | Financial results for the year ended 30 June 2026

                                                                                      Production
                                                        ----------------------------------------------------------------------
                                                                       Quarter ended                        Year to date
                                                        -------------------------------------------  -------------------------
                                                         Sep      Dec      Mar      Jun      Sep      Sep      Sep       Var
                                                         2025     2025     2026     2026     2026     2026     2025       %
                                                        -------  -------  -------  -------  -------  -------  -------  -------
Production and sales                                                                                                                                                                                                                                                                                                                                  
By asset                                                                                                                                                                                                                                                                                                                                              

Copper                                                                                                                                                                                                                                
Metals production is payable metal unless otherwise noted.

Escondida, Chile/1/                           BHP interest 57.5%                                                                                                                                                                                                                                          

               Material mined                 kt        114,527  112,808  114,506  130,749  107,802  107,802  114,527     (6%)      
               Concentrator throughput        kt         36,721   35,628   34,225   35,862   31,429   31,429   36,721    (14%)      
               Average copper grade - 
                  concentrator                %           0.94%    0.91%    0.88%    0.85%    0.81%    0.81%    0.94%    (14%)      
               Production ex mill             kt          294.2    279.7    255.1    253.5    210.0    210.0    294.2    (29%)      
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Payable copper                 kt          282.4    270.5    248.3    245.6    197.9    197.9    282.4    (30%)      
               Copper cathode (EW)            kt           46.5     46.7     54.9     66.3     54.7     54.7     46.5     18%       
                  Oxide leach                 kt           16.8     11.1     19.9     29.3     22.3     22.3     16.8     33%       
                  Sulphide leach              kt           29.7     35.6     35.0     37.0     32.4     32.4     29.7      9%       
               Total copper                   kt          328.9    317.2    303.2    311.9    252.6    252.6    328.9    (23%)      
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Payable gold concentrate       troy oz    35,348   31,927   52,473   39,706   40,946   40,946   35,348     16%       
               Payable silver concentrate     troy koz    1,942    2,176    2,780    2,193    1,790    1,790    1,942     (8%)      
                                                        -------  -------  -------  -------  -------  -------  -------  -------

1   Presented on a 100% basis. BHP interest in saleable production is 57.5%.                                                        
                                                                                                                                    
Pampa Norte (Spence), Chile/1/                BHP interest 100%                                                                                                          

               Material mined                 kt        24,695   22,895   21,690   22,066   21,201   21,201   24,695     (14%)      
               Ore stacked                    kt         5,652    5,354    4,435    5,146    5,386    5,386    5,652      (5%)      
               Average copper grade - stacked %          0.61%    0.58%    0.66%    0.64%    0.56%    0.56%    0.61%      (8%)      
               Concentrator throughput        kt         7,778    8,002    7,329    8,107    7,459    7,459    7,778      (4%)      
               Average copper grade -
                  concentrator                %          0.65%    0.60%    0.53%    0.50%    0.53%    0.53%    0.65%     (18%)      
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Payable copper                 kt          35.4     33.3     25.7     26.9     27.2     27.2     35.4     (23%)      
               Copper cathode (EW)            kt          20.4     24.4     18.9     27.6     20.2     20.2     20.4      (1%)      
               Total copper                   kt          55.8     57.7     44.6     54.5     47.4     47.4     55.8     (15%)      
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Payable gold concentrate       troy oz    2,589    2,724    3,800    3,595    5,379    5,379    2,589     108%       
               Payable silver concentrate     troy koz     358      316      375      241      356      356      358      (1%)      
               Payable molybdenum             t            257      269      194      163      303      303      257      18%       
                                                        -------  -------  -------  -------  -------  -------  -------  -------

1   Pampa Norte consists of Spence and Cerro Colorado. Cerro Colorado 
    entered temporary care and maintenance in December 2023.

                                                                                      Sales
                                                        ----------------------------------------------------------------------
                                                                       Quarter ended                        Year to date
                                                        -------------------------------------------  -------------------------
                                                         Sep      Dec      Mar      Jun      Sep      Sep      Sep       Var
                                                         2025     2025     2026     2026     2026     2026     2025       %
                                                        -------  -------  -------  -------  -------  -------  -------  -------
Production and sales                                                                                                                                                                                                                                                                                                                                  
By asset                                                                                                                                                                                                                                                                                                                                              

Copper                                                                                                                                                                                                                                
Metals production is payable metal unless otherwise noted.

Escondida, Chile/1/                           BHP interest 57.5%                                                                                                                                                                                                                                          

               Material mined                 kt               
               Concentrator throughput        kt               
               Average copper grade - 
                  concentrator                %                
               Production ex mill             kt               
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Payable copper                 kt          258.3    277.7    252.1    233.6    210.7    210.7    258.3    (18%)
               Copper cathode (EW)            kt           38.1     50.0     50.1     71.8     48.4     48.4     38.1     27%
                  Oxide leach                 kt                                                                                
                  Sulphide leach              kt        
               Total copper                   kt          296.4    327.7    302.2    305.4    259.1    259.1    296.4    (13%)
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Payable gold concentrate       troy oz    35,348   31,927   52,473   39,706   40,946   40,946   35,348     16%
               Payable silver concentrate     troy koz    1,942    2,176    2,780    2,193    1,790    1,790    1,942     (8%)
                                                        -------  -------  -------  -------  -------  -------  -------  -------

1   Presented on a 100% basis. BHP interest in saleable production is 57.5%.                                                                                                                                                            
                                                                                                                                                                                                                                      
Pampa Norte (Spence), Chile/1/                BHP interest 100%                                                                                                                                                                                                                                           

               Material mined                 kt              
               Ore stacked                    kt              
               Average copper grade - stacked %               
               Concentrator throughput        kt              
               Average copper grade -
                  concentrator                %               
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Payable copper                 kt           33.2     27.9     34.9     24.4     32.2     32.2     33.2     (3%)
               Copper cathode (EW)            kt           17.9     25.4     17.4     29.3     20.0     20.0     17.9     12%
               Total copper                   kt           51.1     53.3     52.3     53.7     52.2     52.2     51.1      2%
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Payable gold concentrate       troy oz     2,589    2,724    3,800    3,595    5,379    5,379    2,589    108%
               Payable silver concentrate     troy koz      358      316      375      241      356      356      358     (1%)
               Payable molybdenum             t             208      256      205      132      339      339      208     63%
                                                        -------  -------  -------  -------  -------  -------  -------  -------

1   Pampa Norte consists of Spence and Cerro Colorado. Cerro Colorado 
    entered temporary care and maintenance in December 2023.

                                       
--------------------------------------------------------------------------------
                         BHP | Financial results for the year ended 30 June 2026

                                                                                      Production
                                                        ----------------------------------------------------------------------
                                                                       Quarter ended                        Year to date
                                                        -------------------------------------------  -------------------------
                                                         Sep      Dec      Mar      Jun      Sep      Sep      Sep       Var
                                                         2025     2025     2026     2026     2026     2026     2025       %
                                                        -------  -------  -------  -------  -------  -------  -------  -------

Copper (continued)                                                                                                                                                                                                                    

Copper South Australia, Australia             BHP interest 100%                                                                                                                                                                                                                                           

Copper         Payable metal in concentrate   kt           25.5     24.8     28.3     30.7     17.7     17.7     25.5    (31%)      
               Cathode                        kt           52.7     52.9     55.3     60.4     48.8     48.8     52.7     (7%)      
               Total copper                   kt           78.2     77.7     83.6     91.1     66.5     66.5     78.2    (15%)      
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Payable metal in concentrate                                                                             
                  transfer to Olympic Dam     kt           (5.6)    (2.6)    (0.8)    (0.9)    (5.8)    (5.8)    (5.6)     4%       
               Net copper                     kt           72.6     75.1     82.8     90.2     60.7     60.7     72.6    (16%)      
                                                        -------  -------  -------  -------  -------  -------  -------  -------
Gold           Payable metal in concentrate   troy oz    47,893   41,351   48,532   43,408   33,159   33,159   47,893    (31%)      
               Refined gold                   troy oz    50,716   61,910   54,511   63,888   49,656   49,656   50,716     (2%)      
               Total gold                     troy oz    98,609  103,261  103,043  107,296   82,815   82,815   98,609    (16%)      
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Payable metal in concentrate                                                                             
                  transfer to Olympic Dam     troy oz   (11,404)  (4,358)  (1,268)  (1,820)  (8,774)  (8,774) (11,404)   (23%)      
               Net gold                       troy oz    87,205   98,903  101,775  105,476   74,041   74,041   87,205    (15%)      
                                                        -------  -------  -------  -------  -------  -------  -------  -------
Silver         Payable metal in concentrate   troy koz      213      193      226      224      139      139      213    (35%)      
               Refined silver                 troy koz      227      284      308      281      224      224      227     (1%)      
               Total silver                   troy koz      440      477      534      505      363      363      440    (18%)      
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Payable metal in concentrate                                                                             
                  transfer to Olympic Dam     troy koz      (31)     (14)     (4)       (5)     (25)     (25)     (31)   (19%)      
               Net silver                     troy koz      409      463      530      500      338      338      409    (17%)      
                                                        -------  -------  -------  -------  -------  -------  -------  -------
Uranium                                       t             819      903      778    1,147      817      817      819      0%       
                                                        -------  -------  -------  -------  -------  -------  -------  -------      
Olympic Dam                                                                                                                         
               Material mined                 kt          2,818    2,763    2,732    2,927    2,851    2,851    2,818      1%       
               Ore milled                     kt          2,640    2,926    2,565    2,769    2,764    2,764    2,640      5%       
               Average copper grade           %           1.97%    1.97%    1.92%    2.14%    1.98%    1.98%    1.97%      1%       
               Average uranium grade          kg/t         0.55     0.56     0.57     0.65     0.58     0.58     0.55      5%       
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Copper cathode (ER and EW)     kt           52.7     52.9     55.3     60.4     48.8     48.8     52.7     (7%)      
               Refined gold                   troy oz    50,716   61,910   54,511   63,888   49,656   49,656   50,716     (2%)      
               Refined silver                 troy koz      227      284      308      281      224      224      227     (1%)      
               Payable uranium                t             819      903      778    1,147      817      817      819      0%       
Prominent Hill                                                                                                                      
               Material mined                 kt          1,049    1,014    1,026    1,271      975      975    1,049     (7%)      
               Ore milled                     kt          1,621    1,376    1,494    1,651    1,211    1,211    1,621    (25%)      
               Average copper grade           %           0.71%    0.83%    0.90%    0.94%    0.84%    0.84%    0.71%     18%       
               Concentrate produced           kt           19.0     19.1     25.7     30.7     20.5     20.5     19.0      8%       
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Payable copper                 kt            9.9      9.7     11.8     13.1      8.8      8.8      9.9    (11%)      
               Payable gold concentrate       troy oz    24,105   17,406   23,664   18,941   19,072   19,072   24,105    (21%)      
               Payable silver concentrate     troy koz       61       49       60       63       40       40       61    (34%)      
Carrapateena                                                                                                                        
               Material mined                 kt          1,488    1,479    1,632    1,751      753      753    1,488    (49%)      
               Ore milled                     kt          1,511    1,415    1,516    1,713      962      962    1,511    (36%)      
               Average copper grade           %           1.18%    1.20%    1.22%    1.17%    1.07%    1.07%    1.18%     (9%)      
               Concentrate produced           kt           52.4     53.4     61.4     65.2     32.6     32.6     52.4    (38%)      
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Payable copper                 kt           15.6     15.1     16.5     17.6      8.9      8.9     15.6    (43%)      
               Payable gold concentrate       troy oz    23,788   23,945   24,868   24,467   14,087   14,087   23,788    (41%)      
               Payable silver concentrate     troy koz      152      144      166      161       99       99      152    (35%)      
                                                        -------  -------  -------  -------  -------  -------  -------  -------      

                                                                                      Sales
                                                        ----------------------------------------------------------------------
                                                                       Quarter ended                        Year to date
                                                        -------------------------------------------  -------------------------
                                                         Sep      Dec      Mar      Jun      Sep      Sep      Sep       Var
                                                         2025     2025     2026     2026     2026     2026     2025       %
                                                        -------  -------  -------  -------  -------  -------  -------  -------

Copper (continued)                                                                                                                                                                                                                    

Copper South Australia, Australia             BHP interest 100%                                                                                                                                                                                                                                           

Copper         Payable metal in concentrate   kt           15.9     24.8     18.0     27.3     22.9     22.9     15.9     44%
               Cathode                        kt           49.9     55.3     51.2     61.0     46.7     46.7     49.9     (6%)
               Total copper                   kt           65.8     80.1     69.2     88.3     69.6     69.6     65.8      6%
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                        
               Payable metal in concentrate             
                  transfer to Olympic Dam     kt        
               Net copper                     kt        
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                        
Gold           Payable metal in concentrate   troy oz    26,476   45,024   29,234   44,320   35,053   35,053   26,476     32%
               Refined gold                   troy oz    51,147   59,054   57,336   55,962   48,038   48,038   51,147     (6%)
               Total gold                     troy oz    77,623  104,078   86,570  100,282   83,091   83,091   77,623      7%
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                        
               Payable metal in concentrate             
                  transfer to Olympic Dam     troy oz   
               Net gold                       troy oz   
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                        
Silver         Payable metal in concentrate   troy koz      131      207      162      192      180      180      131     37%
               Refined silver                 troy koz      255      250      340      249      234      234      255     (8%)
               Total silver                   troy koz      386      457      502      441      414      414      386      7%
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                        
               Payable metal in concentrate             
                  transfer to Olympic Dam     troy koz  
               Net silver                     troy koz  
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                        
Uranium                                       t            649       815      650    1,552      494      494      649    (24%)
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                                                                                                       
Olympic Dam                                                                                                                                                          
               Material mined                 kt        
               Ore milled                     kt        
               Average copper grade           %         
               Average uranium grade          kg/t      
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                        
               Copper cathode (ER and EW)     kt           49.9     55.3     51.2     61.0     46.7     46.7     49.9     (6%)
               Refined gold                   troy oz    51,147   59,054   57,336   55,962   48,038   48,038   51,147     (6%)
               Refined silver                 troy koz      255      250      340      249      234      234      255     (8%)
               Payable uranium                t             649      815      650    1,552      494      494      649    (24%)
Prominent Hill                                                                                                         
               Material mined                 kt                                    
               Ore milled                     kt                                    
               Average copper grade           %                                     
               Concentrate produced           kt                                    
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                                                    
               Payable copper                 kt            4.4      7.5      3.1     12.2      9.4      9.4      4.4    114%
               Payable gold concentrate       troy oz     9,033   17,671    5,894   23,401   15,199   15,199    9,033     68%
               Payable silver concentrate     troy koz       29       45       20       61       48       48       29     66%
Carrapateena                                                                                                           
               Material mined                 kt                                    
               Ore milled                     kt                                    
               Average copper grade           %                                     
               Concentrate produced           kt                                    
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                                                    
               Payable copper                 kt           11.5     17.3     14.9     15.1     13.5     13.5     11.5     17%
               Payable gold concentrate       troy oz    17,443   27,353   23,340   20,919   19,854   19,854   17,443     14%
               Payable silver concentrate     troy koz      102      162      142      131      132      132      102     29%
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                                                                                                     

                                       
--------------------------------------------------------------------------------
                         BHP | Financial results for the year ended 30 June 2026

                                                                                      Production
                                                        ----------------------------------------------------------------------
                                                                       Quarter ended                        Year to date
                                                        -------------------------------------------  -------------------------
                                                         Sep      Dec      Mar      Jun      Sep      Sep      Sep       Var
                                                         2025     2025     2026     2026     2026     2026     2025       %
                                                        -------  -------  -------  -------  -------  -------  -------  -------

Copper (continued)                                                                                                                                                                                   

Antamina, Peru                                BHP interest 33.75%                                                                                                                                                                                                                                         

               Material mined                 kt         58,970   57,442   54,819   60,871   61,562   61,562   58,970      4%       
               Concentrator throughput        kt         13,307   13,725   13,783   10,984   12,617   12,617   13,307     (5%)       
               Average head grade - copper    %           0.86%    0.98%    1.12%    1.08%    1.02%    1.02%    0.86%     19%       
               Average head grade - zinc      %           1.26%    1.01%    0.79%    0.74%    0.56%    0.56%    1.26%    (56%)       
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Payable copper                 kt           33.9     38.2     44.1     35.3     40.0     40.0     33.9     18%       
               Payable zinc                   t          35,991   27,003   17,723   15,410   10,952   10,952   35,991    (70%)      
               Payable silver                 troy koz    1,632    1,438    1,462    1,056    1,233    1,233    1,632    (24%)      
               Payable lead                   t             754       91      209      225       73       73      754    (90%)      
               Payable molybdenum             t              84       12      147      125      296      296       84    252%       
                                                        -------  -------  -------  -------  -------  -------  -------  -------                     
Carajas, Brazil/1/                            BHP interest 100%                                                                                     
               Material mined                 kt            134      147      148       --       --       --      134     --        
               Ore milled                     kt            160      172      156       --       --       --      160     --       
               Average copper grade           %           1.63%    1.51%    1.48%       --       --       --    1.63%     --       
               Production ex mill             kt           10.3      9.8      8.8       --       --       --     10.3     --       
               Average gold grade             g/t          0.46     0.47     0.47       --       --       --     0.46     --       
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Payable copper                 kt            2.4      2.3      2.1       --       --       --      2.4     --       
               Payable gold concentrate       troy oz     1,816    1,941    1,784       --       --       --    1,816     --        
                                                        -------  -------  -------  -------  -------  -------  -------  -------      
1   The divestment of Carajas was completed on 2 April 2026.                                                                        
                                                                                                                                    
Iron ore                                                                                                                            

Iron ore production is reported on the basis of saleable product, which is wet 
metric tonnes (wmt) for WAIO and dry metric tonnes (dmt) for Samarco.                                                               

WAIO, Australia                               BHP interest 85%                                                                                      

               Newman Joint Venture           kt         13,724   13,340   13,517   12,100   11,300   11,300   13,724    (18%)      
               Area C Joint Venture           kt         29,415   32,265   33,584   33,762   29,149   29,149   29,415     (1%)      
               Yandi Joint Venture            kt          3,498    2,899    2,941    3,252    2,671    2,671    3,498    (24%)      
               Jimblebar/1/                   kt         15,378   19,262   10,880   17,060   21,179   21,179   15,378     38%       
               Total                          kt         62,015   67,766   60,922   66,174   64,299   64,299   62,015      4%       
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Total (100%)                   kt         70,246   76,326   69,752   74,840   71,909   71,909   70,246      2%       
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Lump                           kt                                                                                    
               Fines                          kt                                                                                    
               Total                          kt                                                                                    

               Total (100%)                   kt                                                                                    
                                                        -------  -------  -------  -------  -------  -------  -------  -------

1   Presented on a 100% basis. BHP interest in saleable production is 85%.                                                          
                                                                                                                                    
Samarco, Brazil                               BHP interest 50%                                                                                      
               Total                          kt          2,066    1,938    1,882    1,954    2,151    2,151    2,066      4%       
                                                        -------  -------  -------  -------  -------  -------  -------  -------

                                                                                      Sales
                                                        ----------------------------------------------------------------------
                                                                       Quarter ended                        Year to date
                                                        -------------------------------------------  -------------------------
                                                         Sep      Dec      Mar      Jun      Sep      Sep      Sep       Var
                                                         2025     2025     2026     2026     2026     2026     2025       %
                                                        -------  -------  -------  -------  -------  -------  -------  -------

Copper (continued)                                                                                                                                                                                   

Antamina, Peru                                BHP interest 33.75%                                                                                                                                                                                                                                         

               Material mined                 kt            
               Concentrator throughput        kt             
               Average head grade - copper    %             
               Average head grade - zinc      %              
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Payable copper                 kt           33.1     40.4     43.3     35.9     36.4     36.4     33.1     10%
               Payable zinc                   t          41,499   26,046   18,573   14,703   11,413   11,413   41,499    (72%)
               Payable silver                 troy koz    1,705    1,553    1,201      947      993      993    1,705    (42%)
               Payable lead                   t           1,469      551       14      207      236      236    1,469    (84%)
               Payable molybdenum             t             139       66       58       93      161      161      139     16%
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                                                                                                                                           
Carajas, Brazil/1/                            BHP interest 100%                                                                                                                                                                                                                                           
               Material mined                 kt                                                                                                               
               Ore milled                     kt          
               Average copper grade           %           
               Production ex mill             kt          
               Average gold grade             g/t         
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Payable copper                 kt            2.5      3.0      1.7       --       --       --      2.5     --
               Payable gold concentrate       troy oz     1,964    2,424    1,505       --       --       --    1,964     --
                                                        -------  -------  -------  -------  -------  -------  -------  -------                                                                                                                       
1   The divestment of Carajas was completed on 2 April 2026.                                                                                                                                                                            
                                                                                                                                                                                                                                      
Iron ore                                                                                                                                                                                                                              

Iron ore production is reported on the basis of saleable product, which is wet 
metric tonnes (wmt) for WAIO and dry metric tonnes (dmt) for Samarco.                                                                                  

WAIO, Australia                               BHP interest 85%                                                                                                                                                                                                                                            

               Newman Joint Venture           kt                
               Area C Joint Venture           kt                
               Yandi Joint Venture            kt                
               Jimblebar/1/                   kt               
               Total                          kt               
                                                        
               Total (100%)                   kt               
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Lump                           kt         20,250   20,595   19,878   22,014   18,505   18,505   20,250     (9%)
               Fines                          kt         42,180   46,314   38,730   44,416   47,801   47,801   42,180     13%
               Total                          kt         62,430   66,909   58,608   66,430   66,306   66,306   62,430      6%
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Total (100%)                   kt         70,592   75,397   67,001   75,105   73,953   73,953   70,592      5%
                                                        -------  -------  -------  -------  -------  -------  -------  -------

1   Presented on a 100% basis. BHP interest in saleable production is 85%.                                                                                                                                                              
                                                                                                                                                                                                                                      
Samarco, Brazil                               BHP interest 50%                                                                                                                                                                                                                                            
               Total                          kt          2,042    2,512    1,590    1,950    1,941    1,941    2,042     (5%)
                                                        -------  -------  -------  -------  -------  -------  -------  -------

                                       
--------------------------------------------------------------------------------
                         BHP | Financial results for the year ended 30 June 2026

                                                                                      Production
                                                        ----------------------------------------------------------------------
                                                                       Quarter ended                        Year to date
                                                        -------------------------------------------  -------------------------
                                                         Sep      Dec      Mar      Jun      Sep      Sep      Sep       Var
                                                         2025     2025     2026     2026     2026     2026     2025       %
                                                        -------  -------  -------  -------  -------  -------  -------  -------

Coal                                                                                                                                                                                                                                  
Coal production is reported on the basis of saleable product.

BMA, Australia                                BHP interest 50%                                                                                                                                                                                                                                            

               Goonyella                      kt          1,880    1,254    1,124    1,995    1,909    1,909    1,880      2%       
               Peak Downs                     kt          1,111      967    1,176    1,584    1,191    1,191    1,111      7%       
               Saraji                         kt            884    1,146      849    1,073      846      846      884     (4%)       
               Caval Ridge                    kt            990      924      667    1,002      967      967      990     (2%)       
               Total/1/                       kt          4,865    4,291    3,816    5,654    4,913    4,913    4,865      1%       
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Total  (100%)/1/               kt          9,730    8,582    7,632   11,308    9,826    9,826    9,730      1%       
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Hard coking coal               kt                                                                                                    
               Energy coal                    kt                                                                                                    
               Total                          kt                                                                                                    

               Total (100%)                   kt                                                                                                    
                                                        -------  -------  -------  -------  -------  -------  -------  -------

1   Production figures include some energy coal.                                                                                                    
                                                                                                                                                    
NSWEC, Australia                              BHP interest 100%                                                                                                        
               Energy coal - Export           kt                                                                                                    
               Energy coal - Domestic         kt                                                                                                    
               Total                          kt          3,518    4,610    4,037    4,196    4,449    4,449    3,518     26%                       
                                                        -------  -------  -------  -------  -------  -------  -------  -------

                                                                                      Sales
                                                        ----------------------------------------------------------------------
                                                                       Quarter ended                        Year to date
                                                        -------------------------------------------  -------------------------
                                                         Sep      Dec      Mar      Jun      Sep      Sep      Sep       Var
                                                         2025     2025     2026     2026     2026     2026     2025       %
                                                        -------  -------  -------  -------  -------  -------  -------  -------

Coal                                                                                                                                                                                                                                  
Coal production is reported on the basis of saleable product.

BMA, Australia                                BHP interest 50%                                                                                                                                                                                                                                            

               Goonyella                      kt              
               Peak Downs                     kt              
               Saraji                         kt               
               Caval Ridge                    kt               
               Total/1/                       kt              

               Total  (100%)/1/               kt             
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Hard coking coal               kt          4,428    4,302    3,842    5,522    4,733    4,733    4,428      7%
               Energy coal                    kt             44      111       10      383       88       88       44    100%
               Total                          kt          4,472    4,413    3,852    5,905    4,821    4,821    4,472      8%
                                                        -------  -------  -------  -------  -------  -------  -------  -------
               Total (100%)                   kt          8,944    8,826    7,704   11,810    9,642    9,642    8,944      8%
                                                        -------  -------  -------  -------  -------  -------  -------  -------

1   Production figures include some energy coal.                                                                                                                    
                                                                                                                                                                                                     
NSWEC, Australia                              BHP interest 100%                                                                                                                                                                                                                                           
               Energy coal - Export           kt          3,549    4,190    3,935    4,224    3,879    3,879    3,549      9%
               Energy coal - Domestic         kt            158      182      113      314       52       52      158    (67%)
               Total                          kt          3,707    4,372    4,048    4,538    3,931    3,931    3,707      6%
                                                        -------  -------  -------  -------  -------  -------  -------  -------

                                       
--------------------------------------------------------------------------------
                         BHP | Financial results for the year ended 30 June 2026

Appendix 3

Executive Summary

Olympic Dam - Updated Mineral Resources

Table 1: Updated Olympic Dam Mineral Resources (inclusive of Ore Reserves) as at 1st September 2026/1/

                                       Measured Resources                   Indicated Resources
                              ------------------------------------ ------------------------------------
                                          U\\3\\O\\8\\   Au    Ag              U\\3\\O\\8\\   Au    Ag
Material type                   Mt   Cu %     kg/t      g/t   g/t    Mt   Cu %     kg/t      g/t   g/t
----------------------------- ----- ----- ------------ ----- ----- ----- ----- ------------ ----- -----
UG Sulphide (Block
  Cave)/2/,/3/,/4,/5/,/6/.... 4,000  0.61         0.19  0.21     1 4,130  0.57         0.18  0.21     1
UG Sulphide (SLOS)/7/........   840  1.59         0.47  0.62     3   540  1.56         0.45  0.57     3
OC Sulphide/8/...............    --    --           --    --    --    --    --           --    --    --

                                       Inferred Resources                     Total Resources
                              ------------------------------------ ------------------------------------
                                          U\\3\\O\\8\\   Au    Ag              U\\3\\O\\8\\   Au    Ag
Material type                   Mt   Cu %     kg/t      g/t   g/t    Mt    Cu %    kg/t      g/t   g/t
----------------------------- ----- ----- ------------ ----- ----- ------ ----- ------------ ----- -----
UG Sulphide (Block
  Cave)/2/,/3/,/4,/5/,/6/.... 2,600  0.60         0.19  0.23     1 10,730  0.59        0.19  0.21     1
UG Sulphide (SLOS)/7/........   210  1.44         0.42  0.63     3  1,590  1.56        0.46  0.60     3
OC Sulphide/8/...............    --    --           --    --    --     --    --          --    --    --

Footnotes for Table 1

1.   The information in this report that relates to Mineral Resources is based
     on and fairly represent the information and supporting documentation
     compiled by MP O'Hare, a Competent Person who is a Member of The
     Australasian Institute of Mining and Metallurgy (MAusIMM). The Competent
     Person is a full-time employee of BHP and has sufficient experience that is
     relevant to the style of mineralisation and type of deposit under
     consideration and to the activity being undertaken to qualify as a
     Competent Person as defined in the 2012 Edition of the 'Australasian Code
     for Reporting of Exploration Results, Mineral Resources and Ore Reserves'.
     The Competent Person confirms they have no conflict of interest, perceived
     or otherwise, and consents to the inclusion in the report of the matters
     based on their information in the form and context in which it appears.
     Tonnes and grades have been rounded so small differences may present in the
     totals.
2.   Block cave Mineral Resource assumes prior mining of declared underground
     (UG) sub-level open stoping (SLOS) Mineral Resource.
3.   A break-even economic cut-off of (greater than or equal) 0.35% Cu was
     applied to each selective mining unit (SMU) (after depletion for existing
     mining and entire SLOS Mineral Resource).
4.   Minimum SMU comprised of three connected regularised blocks with dimensions
     of 100 m by 100 m in XY and minimum of 200 m in Z, and a maximum depth of
     ~1,500 m from surface.
5.   SMU which contained (greater than or equal) 50% backfill (actual or future)
     was classified as Inferred.
6.   Geological confidence is informed by drilling samples, with drill spacing
     of <80 m for Measured, 80 m to 180 m for Indicated, and 180 m to 300 m for
     Inferred Resources.
7.   The UG Sulphide (SLOS) Mineral Resource is unchanged from that reported in
     BHP's FY26 Annual Report (www.bhp.com), where it is referred to as 'UG
     sulphide'.
8.   The UG Sulphide (SLOS) and UG Sulphide Block Cave (BC) Mineral Resources
     together account for the majority of the shallower mineralisation. The
     remaining mineralisation is insufficient to warrant ongoing reporting of an
     Open Cut (OC) Mineral Resource, and has been removed.

Table 2: Olympic Dam Ore Reserves as at 30th June 2026/1/

                                     Proved Ore Reserve             Probable Ore Reserve             Total Ore Reserve
                              ------------------------------- ------------------------------- -------------------------------
                                       U\\3\\O\\8\\  Au   Ag           U\\3\\O\\8\\  Au   Ag           U\\3\\O\\8\\  Au   Ag
Material type                  Mt Cu %     kg/t      g/t  g/t  Mt Cu %     kg/t      g/t  g/t  Mt Cu %     kg/t      g/t  g/t
----------------------------- --- ---- ------------ ---- ---- --- ---- ------------ ---- ---- --- ---- ------------ ---- ----
UG Sulphide/2/,/3/,/5/,/6/... 355 1.89         0.59 0.72    4 254 1.68         0.53 0.62    3 609 1.80         0.56 0.68    4
Low grade/4/.................  --   --           --   --   --  44 0.83         0.28 0.34    2  44 0.83         0.28 0.34    2

Footnotes for Table 2

1.   The information in this report that relates to Ore Reserves is based on and
     fairly represent the information and supporting documentation compiled by
     Naveen S Kinthada, a Competent Person who is a Member of The Australasian
     Institute of Mining and Metallurgy (MAusIMM). The Competent Person is a
     full-time employee of BHP and has sufficient experience that is relevant to
     the style of mineralisation and type of deposit under consideration and to
     the activity being undertaken to qualify as a Competent Person as defined
     in the 2012 Edition of the 'Australasian Code for Reporting of Exploration
     Results, Mineral Resources and Ore Reserves'. The Competent Person confirms
     they have no conflict of interest, perceived or otherwise, and consents to
     the inclusion in the report of the matters based on their information in
     the form and context in which it appears. Tonnes and grades have been
     rounded so small differences may present in the totals.
2.   Ore Reserves are declared using a SLOS mining method and are unchanged from
     that reported in BHP's FY26 Annual Report (www.bhp.com).
3.   Variable cut-off between 1.0% and 1.7% Cu
4.   Low-grade is (greater than or equal)0.6 Cu%
5.   Approximate drill-hole spacing used to classify the reserves were: 20 m to
     35 m for Proved Reserves and 35 m to 70m for Probable Reserves.
6.   The metallurgical recoveries: Cu 94%, U\\3\\O\\8\\ 65%, Au 71%, Ag 63%.

                                      
--------------------------------------------------------------------------------
                         BHP | Financial results for the year ended 30 June 2026

1 Introduction

This report is issued in support of the first-time reporting of an underground
block cave (BC) Mineral Resource at Olympic Dam, alongside the existing
underground sub-level open stoping (SLOS) Mineral Resource. Ore Reserves remain
unchanged from that reported in the FY26 Annual Report and is included for
transparency and completeness. The newly reported Block Cave Mineral Resource
has not been converted to Ore Reserve. The UG Sulphide (SLOS) and UG Sulphide
Block Cave (BC) Mineral Resources together account for the majority of the
shallower mineralisation. The remaining mineralisation is insufficient to
warrant ongoing separate reporting of an Open Cut (OC) Mineral Resource and has
been removed. These changes reflect the application of updated mining scenarios
for the Olympic Dam Deposit: selective sub-level open stoping for higher-grade
material and bulk underground mining, such as block caving, for large continuous
volumes. Together, these scenarios support assessment of future mining options
as studies progress.

Olympic Dam is an integrated copper (Cu), uranium (U\\3\\O\\8\\), gold (Au) and silver
(Ag) mine located on traditional Kokatha Country in South Australia, 16
kilometres north of Roxby Downs and approximately 570 kilometres north-northwest
of Adelaide, the capital of South Australia (Figure 1). The operation consists
of an underground mine, mineral processing plant, copper smelter and refinery,
as well as associated infrastructure. These are contained within the Olympic
Dam's special mining lease (SML) (Figure 2).

The updated Mineral Resource is based on the underlying resource model reported
in BHP's FY2026 Annual report as at 30 June 2026 (www.bhp.com). Material outside
the existing SLOS Mineral Resource, including the relevant portion of
mineralisation previously reported as OC, was reassessed for reasonable
prospects of eventual economic extraction under a block-caving scenario. Total
drilling for the updated Olympic Dam Mineral Resource is approximately 4,070 km,
with a nominal drill hole spacing ranging from 20 m to >300 m, and approximately
perpendicular to the interpreted orebody orientation. Resource definition
drilling activities continue at Olympic Dam.

The Olympic Dam BC Mineral Resource is 10,730 Mt at 0.59 % Cu, 0.19 kg/t
U\\3\\O\\8\\, 0.21 g/t Au, and 1 g/t Ag (Table 1). This considers a
non-selective underground block caving scenario, reporting all material within a
continuous shape designed to capture material generally above 0.35% Cu, where
all material was deemed to have reasonable prospects of eventual economic
extraction. As such, zero-grade waste material was included as internal dilution
to account for the non-selective nature of block caving. As mining studies
progress, the constraint (and therefore the reported Olympic Dam Mineral
Resource) may change; block-cave mining remains at an early stage of assessment,
and its potential development timeframe is not yet known.

The inclusion of an underground bulk mining method provides an updated total
classified underground Mineral Resource for Olympic Dam, estimated to contain
88.1 Mt of Cu, 2.8 Mt of U\\3\\O\\8\\, 103 Moz of Au and 498 Moz of Ag, where
Moz is million troy ounces. Contained metal estimates are calculated from the
rounded total Resource tonnages and grades reported in Table 1, and are not an
estimate of recoverable metal. Totals may differ due to rounding.

Mineralisation remains open at depth/1/.

2 Mineral tenement and land tenure

The Roxby Downs (Indenture Ratification) Act 1982 (SA) provides statutory
authority for an agreement (Indenture) between BHP and the State of South
Australia. The Indenture establishes the legal framework for existing and future
operations at Olympic Dam and defines the roles and responsibilities of the
South Australian Government and BHP. Part of the Indenture provided the grant of
Olympic Dam's special mining lease (SML).

The Indenture confers continuous mining rights (via the SML) to BHP until the
deposit is economically depleted. The current 50-year term of the SML ends in
2036. Under key amendments to the Indenture agreed between the South Australian
Government and BHP in 2026, a Final Investment Decision (FID) by BHP for the
first phase of the Smelter Refinery Expansion Project would trigger rights for
the expansion of the SML boundaries and extension of the SML term by 10 years to
2046. A subsequent FID by BHP for the Mine Concentrator Growth Project would
trigger a right to extend the SML term for a further 40 years to 2086. In
addition to these specific extension rights, the Indenture still provides rights
for further SML term extensions linked to the expected life of the mine
(regardless of any FIDs by BHP). All agreements are in place as part of the
normal operating practices.

----------
1    BHP Quarterly Activities Report, 18th Jan 2024 "Operational review for the
     half year ended 31 December 2023". Appendix 3, Project status update -
     Olympic Dam "Deeps" (OD Deeps). www.bhp.com

                                       
--------------------------------------------------------------------------------
                         BHP | Financial results for the year ended 30 June 2026

                                    [GRAPHIC]

                   Figure 1. Location of the Olympic Dam mine.

                                       
--------------------------------------------------------------------------------
                         BHP | Financial results for the year ended 30 June 2026

                                    [GRAPHIC]

    Figure 2. Approximate Olympic Dam resource outline within Special Mining
                                  Lease 1 (SML)

                                       
--------------------------------------------------------------------------------
                         BHP | Financial results for the year ended 30 June 2026

3 Geology

The Olympic Dam deposit lies entirely within the Olympic Dam Breccia Complex
(Figure 3), which is hosted by the 1,593.28 (plus-minus)0.26 Ma Roxby Downs
Granite. The breccia complex contains the mineralised rock volume and covers
approximately 50 km/2/. It is about 6 km long and 3 km wide, typically extends
to a depth of 900 m, and locally reaches more than 2,000 m below surface.

Approximately 350 m of unaltered, unmineralised, flat-lying Neoproterozoic to
Cambrian sedimentary rocks unconformably overlie the breccia complex. The Roxby
Downs Granite is the principal host rock. Other important components are bedded
clastic facies; clasts of 1,594.63 +/- 0.71 Ma Gawler Range Volcanic felsic
feldspar-phyric lavas in hematite-rich breccias and dykes; and mafic-ultramafic
lavas and dykes (MDY). The MDY are pre-, syn- and post-mineralisation, and form
an integral part of the Olympic Dam ore-forming system. The breccia complex and
the surrounding unbrecciated Roxby Downs Granite are intruded by the regionally
extensive ca. 825 Ma Gairdner Dyke Swarm (dolerite).

Mineralisation is hosted by Roxby Downs Granite and other lithologies, including
bedded clastic facies, felsic lavas, mafic-ultramafic lavas, sills and dykes,
and subvolcanic quartz-phyric rhyolite. Tectonic, magmatic and hydrothermal
processes have weakly to intensely brecciated these rocks. Iron oxide alteration
has variably replaced them, producing a compositional continuum from
recognisable lithologies to iron oxide breccias in which primary lithological
textures have been obliterated. Faulting and brecciation commonly obscure
lithological contacts.

More than 100 minerals occur in the deposit, although 15 account for more than
98% of the rock mass. The principal gangue minerals are hematite, quartz,
muscovite, K-feldspar, chlorite, fluorite, siderite and barite. The dominant
sulphide minerals are chalcocite/digenite/djurleite (collectively referred to
here as chalcocite), bornite, chalcopyrite and pyrite. Sphalerite, galena,
molybdenite and tennantite-tetrahedrite are less abundant, while native copper
occurs only in trace amounts. Sulphides generally occur as disseminated grains
within the breccia matrix and clasts, ranging in size from <20 (mew)m to several
millimetres, with an average grain size of approximately 100 (mew)m. They only
rarely occur as veins in granite-dominated breccias.

At the deposit scale, Cu (plus-minus) Fe sulphides show a distinct upward and
inward zonation: pyrite (right arrow) chalcopyrite-pyrite (right arrow)
chalcopyrite exsolution lamellae in brown bornite (right arrow) purple
bornite-chalcocite symplectites (right arrow) digenite lamellae in chalcocite.

                                      
--------------------------------------------------------------------------------
                         BHP | Financial results for the year ended 30 June 2026

                                    [GRAPHIC]

 Figure 3. Simplified geological plan of the Olympic Dam deposit, approximately
                              350 m below surface.

                                       
--------------------------------------------------------------------------------
                         BHP | Financial results for the year ended 30 June 2026

                                    [GRAPHIC]

Figure 4. Plan view of the Olympic Dam deposit, showing the spatial relationship
  between a 0.35% Cu envelope, the outlines of mineral resource block cave and
 sublevel stoping. Mined stope, development and drilling provided for context.

                                       
--------------------------------------------------------------------------------
                         BHP | Financial results for the year ended 30 June 2026

                                    [GRAPHIC]

 Figure 5. Long section through the Olympic Dam deposit along A - A' (Figure 4)
looking NE. The ~500 m thick projection shows the spatial relationship between a
  0.35% Cu envelope, the outlines of mineral resource block cave and sublevel
      stoping. Mined stope, development and drilling provided for context

                                       
--------------------------------------------------------------------------------
                         BHP | Financial results for the year ended 30 June 2026

4 Data acquisition

4.1 Drilling and sampling

Drilling comprises oriented and unoriented diamond drilling from surface and
underground locations. The drilling includes parent holes and, where additional
trajectories are required, wedge holes. A parent hole is the primary drill hole;
a wedge hole is a subsidiary or "child" hole initiated from a parent hole at
depth, allowing several trajectories to be drilled from a single parent-hole
collar. Drill spacing varies across the deposit from approximately 20 m to >300
m, and drilling is generally oriented perpendicular to the interpreted orebody
geometry.

Surface drilling comprised parent holes and, where required, wedge holes drilled
from parent holes. Surface parent holes were collared in PQ3 diameter (83 mm)
through the overburden and continued in HQ3 (61.1 mm) or HQ (63.5 mm) core.
Wedge holes were generally drilled in NQ2 diameter (50.6 mm). Navigational
drilling was used in selected surface and underground programs to support
trajectory control, including parent-hole and wedge-hole drilling. Downhole
survey methods and quality control are described in Section 4.3 Surveys.

Longer underground parent holes were collared in HQ diameter (63.5 mm) to
approximately 500 m, continued in NQ2 diameter (50.6 mm) to approximately 1,700
m, and completed in BQ diameter (36.5 mm) where required. Underground infill and
grade-control holes were drilled in BQ diameter (36.5 mm) and were generally not
oriented. Longer holes were oriented using the REFLEX ACT III tool; at the end
of each run, the drillers marked the low side of the core, which was then used
as the reference for marking the core and recording structural measurements.
Grade-control holes were generally not oriented and were therefore not used for
oriented structural measurements.

The drilling data and distribution are considered sufficient to support
interpretation of geological and grade continuity for the declared Mineral
Resource for an underground bulk-mining scenario and the existing Mineral
Resource declaration for the selective-mining method. The geology is supported
by ongoing underground mapping and mining. Drilling orientations were selected
to test the interpreted mineralisation and structures, and the scale and
geometry of the mineralised system in relation to the drilling orientation is
unlikely to have introduced material sampling bias.

Sample recovery was estimated during logging by reconciling the cumulative
reconstructed core length with the drilled length for each core run. Estimated
recoveries were high, generally exceeding 99%. Fresh core is relatively
competent, and the sulphide minerals are generally not friable. There is no
clear relationship between sample recovery and grade in Olympic Dam drill core;
consequently, no material bias is expected from preferential loss or gain of
fine or coarse material.

Drill holes were logged in qualitative detail below the post-mineralised cover.
Logging included lithology, rock composition and texture, alteration minerals,
sulphide distribution, mineralisation characteristics and geotechnical
information for rock-mass qualification. Structural measurements were recorded
from oriented core, and core was photographed dry. Geological, geotechnical,
structural, sampling and assay data were managed in a SQL server-hosted
database. Logging was completed to a standard appropriate for Mineral Resource
estimation, mining studies and metallurgical studies.

Diamond core was split using an automatic core saw. One half was submitted for
assay and the other half was retained in labelled trays at the Olympic Dam core
storage facility. Retention of the half core provides material for geological
review and verification sampling, while the generally competent nature of the
fresh core and non-friable sulphide mineralisation supports preservation of
representative material in storage.

No dedicated twinned holes have been drilled. Wedge drilling, proximal or
cross-cutting drilling, close to existing mineralisation shows some short-scale
variations in the tenor of mineralisation. However, this close-spaced drilling
provides correlation and general support for the geological and grade modelling.

The majority (>91%) of mineralised diamond core was sampled at the standard
interval appropriate to the core diameter: predominantly 2 m and 1 m for NQ2
core, and 2.5 m for BQ/BQTK core. These interval lengths were selected to
provide representative sample masses of approximately 4-8 kg and are supported
by Olympic Dam site-specific sampling testwork and sample nomograms, which
demonstrated that the intervals provide an appropriate balance between sample
precision and practical sample-preparation requirements for the respective core
sizes. Minor (<9%) historical samples were collected at 1 m or 5 m intervals;
these data are retained and used subject to the applicable data validation,
compositing and estimation controls.

Samples were submitted to an analytical laboratory for final drying, staged
crushing to 2 mm, splitting to an approximately 2-3 kg portion and pulverisation
to produce a pulp with 90% passing 75 (mew)m. Duplicate samples were collected at
each preparation stage where a reduction in sample mass occurred. Bulk dry
density was measured on all assayed samples using the water-immersion method on
core samples at the Olympic Dam core-processing facilities.

The mineralisation is readily identifiable from alteration, brecciated textures
and the presence of sulphides, and is relatively pervasive through the broader
mineralised zones. Sample sizes and the sampling intervals are therefore
considered appropriate for the style of mineralisation. Sampling, assay and
quality-control methodologies have been established over several decades and are
applied consistently across the relevant drilling methods.

                                       
--------------------------------------------------------------------------------
                         BHP | Financial results for the year ended 30 June 2026

4.2 Surveys

All surface drill hole collar locations (historic and recent) have been surveyed
with Leica GS16 Rover and transferred to Olympic Dam's acQuire database.
Underground drill hole collar locations have been surveyed using Leica TS16
Total Station, or TS15 / TS14 prior to 2006. All drilling survey methods are
considered appropriate for the estimation and mining of Olympic Dam.

Downhole surveying of surface diamond drilling was carried out at 18 m intervals
using a REFLEX GYRO SPRINT-IQ/TM/ tool using GYRO North Seeking (NS) single-shot
mode. At the completion of each hole a continuous survey was taken from the
collar to end of hole for comparison and quality control. Downhole surveying of
underground diamond drilling was undertaken using REFLEX magnetic camera tools.

BHP applies robust quality assurance and quality control (QA/QC) standards and
procedures to collar and downhole-survey data. Collar and downhole surveys are
managed in the acQuire database through controlled imports, validation checks
and review of survey type, grid and azimuth; downhole surveys are also assessed
for compliance with the planned drillhole orientation. Validated, appropriately
ranked survey data are exported for use in resource modelling, and sample
locations are therefore considered suitable for Mineral Resource estimation.

The topography at Olympic Dam is relatively flat, and along with any mining
excavations, has been surveyed by airborne LiDAR. The region has minimal
vegetation and cover. Surface topographic model is considered appropriate for
use in the resource model and mining of Olympic Dam.

4.3 Sample security

Core trays are transported by BHP contractors from the drill rigs to the core
processing facility at Olympic Dam, Roxby Downs. Samples in calico bags are
transported from Olympic Dam via road on trucks to the external laboratory
Intertek, Adelaide, South Australia. Calico bag numbers are automatically
generated. Intertek is informed of the sample number ranges for each pending
shipment, and these are recorded in Intertek's management system. Intertek use
these to create barcode labels for geochemical bags used for storing the
pulverised samples. On sample receipt, Intertek manually checks the submitted
sample list against all samples in the shipment. Once the samples are
pulverised, all further steps are tracked using the barcodes. BHP is informed of
any discrepancies.

BHP has internal governance and standards related to sample security and data
management. BHP undertakes routine verification of these practices.

4.4 Quality of assay data and laboratory tests

Samples were submitted to Intertek Group plc, Adelaide, and analysed using
either the routine Olympic Dam multi-element suite or the expanded Olympic Dam
multi-element suite, as detailed below. Intertek has ISO/IEC 17025 laboratory
accreditation.

The routine suite includes Cu, Ag, Co, Ni, Pb, Zn (3-acid digest, measured via
ICP-OES) and Li-borate fusion measured via ICP-OES/MS (Al, As, Ba, Bi, Ca, Ce,
Cr, Fe, K, La, Mg, Mn, Mo, Na, P, Sb, Sc, Si, Sr, Ti, U, V, Y, Zr). The expanded
suite includes 4-acid digest measured via ICP-OES/MS (Cu, Ni, Pb, Zn, Ag, As,
Bi, Cd, Co, Ge, In, Li, Re, Se, Te, Tl) and Li-borate fusion measured via
ICP-OES/MS (Al, As, Ba, Be, Bi, Ca, Ce, Cr, Cs, Dy, Er, Eu, Fe, Ga, Gd, Hf, Ho,
K, La, Lu, Mg, Mn, Mo, Na, Nb, Nd, P, Pr, Rb, Sb, Sc, Si, Sm, Sn, Sr, Ta, Tb,
Th, Ti, Tm, U, V, W, Y, Yb, Zr) and loss-on-ignition. All samples were assayed
for Au via 25-g fire assay with ICP-OES finish, and C and S via induction
furnace combustion, measured by infrared analyser.

Comparative analysis between the 4- and 3-acid digest methods demonstrates equal
accuracy and precision within the Olympic Dam mineral system. The 4-acid digest
was used to expand the geochemical suite of elements when initially
characterising new parts of the deposit.

BHP maintains robust QA/QC standards and procedures for sampling and assay
quality. All routine assay QA/QC samples were analysed by Intertek Adelaide, the
external primary laboratory, including half-core field duplicates, coarse and
pulp duplicates; Intertek also inserted matrix-matched certified reference
materials and blanks at defined rates.

Quality-control samples comprised pulp duplicates at 3%, half-core field
duplicates at 1% and Boyd crusher/coarse duplicates at 1%, equivalent to
duplicates at a minimum rate of 1:20. Analytical blanks, including BHP supplied
blanks and additional laboratory blanks, were inserted at a minimum rate of
1:50. Intertek manages and inserts both blank types, and BHP reviews performance
internally and with Intertek on at least a monthly basis. Certified reference
materials were inserted at a minimum rate of 1:25, with actual rates varying by
analytical method.

Quality control results were reviewed when received and all results were within
acceptable accuracy and precision limits.

BHP has robust standards and procedures relating to data transfers (from
laboratory to Olympic Dam's acQuire database, and from database to user), with
strictly monitored permission controls relating to reviewers, approvers and
users of exported data. Data was electronically uploaded to Olympic Dam's
acQuire database as received from the external laboratory. All drill hole data
was managed internally via a SQL server-hosted database with strict validation
rules. Adjustments to the received assay data included; copper values converted
from parts per million (ppm) to percent (%), and values that returned below the
detection limit were assigned a value equal to half of the applicable detection
limit: 0.001% and 0.0025% for Cu (3- and 4-acid digests, respectively), 0.5 ppm
and 0.025 ppm for Ag (3- and 4-acid digests, respectively), 0.0025 ppm for Au,
and 0.25 ppm for U\\3\\O\\8\\.

A full pulp library, as well as all unsampled reference half core, is retained
at the Olympic Dam mine site. These samples are available for verification
sampling, if required, due to stable storage in a low humidity desert
environment. This is supplemented by core photography of all drilling.

                                       
--------------------------------------------------------------------------------
                         BHP | Financial results for the year ended 30 June 2026

Dr Francis Pitard reviewed Olympic Dam processing facilities, sampling stations
and Intertek Laboratory in 2023 with no material observations. BHP routinely
reviews standards, procedures and results from external laboratories. No issues
have been noted from any BHP review.

4.5 Database management and security

Geological and geotechnical logging are collected via company digital logging
tablets and loaded to Olympic Dam's acQuire geological database. Geologists
request sampling intervals through customised acQuire user interfaces. Entry of
assay data was through the direct loading of laboratory assay files into the
acQuire geological database.

Data validation steps included, but were not limited to the following:

.    QAQC vetting of data by Intertek laboratory prior to transmission to BHP,
     followed by further QAQC vetting by BHP prior to acceptance into Olympic
     Dam's acQuire database.

.    Additional validation through constraints and libraries set in the database
     by the Database Manager (e.g. overlapping/missing intervals, intervals
     exceeding maximum depth, valid geology codes, missing assays, prioritised
     assay protocol).

.    Post data-entry validation included secondary system checks and
     visualisation in 3D software to check for collar, survey or assay import
     errors.

4.6 Geophysical data

2D and pseudo 3D seismic data acquisition was undertaken in July 2022. In
June-August 2023 BHP acquired 3D seismic data. 3D seismic data is used to inform
known deposit scale structural continuity beyond drilling data.

4.7 Site visits

The Competent Person last visited the Olympic Dam mine in April 2026. The site
visit included a review of drilling practices, drilling results and geology, and
sampling and logging practices. While at the core processing site, checks
included validation of sampling, density data collection, and sample and pulp
storage.

5 Mineral Resource estimation

The first-time reporting of the underground block cave Mineral Resource at
Olympic Dam is presented in Table 1.

The Olympic Dam Mineral Resource is based on:

.    17,557 diamond drill holes (surface and underground drilling) comprising a
     total of 4,660,620 m of drilling. Of this, 4,067,581 m of the drilling has
     been sampled. A total of 2,613,301 m of the sampled drilling occurs within
     copper-sulphide domains.

.    Sampling was predominantly 1 m or 2.5 m, together accounting for more than
     85% of all samples.

.    Nominal drill hole spacing ranges from 20 m to >300 m.

The Olympic Dam mineralised deposit is approximately six kilometres long and
three kilometres wide and typically extends to depths of 900 m, and locally
beyond 2,000 m beneath the surface. The mineralisation at Olympic Dam is open at
depth in local areas.

Deterministic geological models (wireframes) of the sulphide species are built
in Leapfrog modelling software, using a combination of implicit geological
modelling combined with local updates driven by geological sectional
interpretation. Extensive peer reviews of the geological models are undertaken
prior to use in resource estimation.

The confidence of the geological interpretation of the Olympic Dam mineral
deposit is supported by a long history of diamond drilling, geological logging,
assay results, underground mapping, and reconciliation of mined material and
metal production. Confidence in the mineralised model is sufficient in areas
declared as Mineral Resource, where mineralisation orientations are adequately
constrained by data spacing and supported by lithological, alteration and
structural modelling. Areas outside the declared Mineral Resource generally have
lower confidence due to wider drill spacing, reduced geological confidence, or
insufficient demonstrated mineralisation continuity at a scale relevant to
potential underground mining methods, including both bulk and selective mining
scenarios. Future drilling and studies may refine these interpretations.

The Mineral Resource estimation process included:

.    Raw assay data composited to 5 m lengths, due to consideration of sampling,
     mineralisation style and mining method choices, with the relevant domains
     flagged after compositing.

.    Statistical analysis of the composites within key mineralisation domains.

.    Variography modelling on mineralisation, sulphide and orientation domains.

.    Identification of outliers and application of high yield thresholds to the
     composites, determined by geostatistical domain analysis and calculated
     using a metal-at-risk approach.

                                      
--------------------------------------------------------------------------------
                         BHP | Financial results for the year ended 30 June 2026

.    For the mineralised domains being reported, estimation of grade and density
     via either a combination of multiple-indicator kriging with ordinary
     kriging (MIK-OK) or ordinary kriging (OK) methods within estimation domains
     constrained by mineralisation through sulphide domains and orientation
     domains.

Estimation was undertaken using Vulcan mining software (version 2023.4). Drill
hole information is exported from the acQuire database as ASCII format text
files and imported into a Vulcan format drill hole dataset. No top-cutting is
applied; extreme or outlier values are instead managed using the high yield
thresholds described above, which are customised to each stope area domain.

The block model uses estimation supports approximate to drilling density and
resource confidence. Measured blocks are estimated at 5 m X by 10 m Y by 5 m Z
support, while Indicated and Inferred blocks are estimated at 30 m X by 30 m Y
by 15 m Z support. The model is sub celled to a minimum of 2.5 m in each
dimension to represent geological domain boundaries accurately.

The classified elements reported in the Mineral Resource are Cu, U\\3\\O\\8\\,
Au and Ag. All four are estimated using the same MIK-OK methodology and the same
variography approach described below, with the exception that Au and Ag are
subject to an additional Indicator Kriging (IK) domaining step to account for
the portion of Au and Ag mineralisation not contained within the sulphide
domains. Dry bulk density is also estimated using this approach (see Section 5.5
Moisture and density). As Cu is the main economic element at Olympic Dam and
MIK-OK is the predominant estimation method applied, the following discussion of
variography modelling is framed in terms of Cu.

The MIK-OK methodology uses two estimation techniques: MIK and OK. The intent of
the MIK technique is to divide the grade distribution into 20 domains (classes)
using 19 strategic cut-offs. The spatial variability of grade within these 20
domains is modelled using three indicator variograms. The indicator cut-offs are
calculated based on a mixture of metal abundance in each class, the number of
sample composites within each class, and the overall shape of the grade
distribution. Typically, the three cut-offs occur at 50%, 30% and 20%,
respectively, of the available sample composites in the distribution, resulting
in apportionment of the distribution into low, medium and high-grade variography
components.

The OK component of the MIK-OK method uses the samples flagged against the MIK
estimate to derive the final block grade. The spatial variability of the flagged
samples is modelled using two variograms, which are based on a 50/50 split of
the 20 MIK classes described above.

The resource estimation process has well established procedures, including peer
reviews, that govern geological interpretation, resource estimation and
reporting of Mineral Resources. Documentation is stored electronically in a
secure centralised location. These documents contain information on deposit
geology, geometry, detailed geological and geostatistical modelling, data
preparation including compositing, and classification parameters.

The classified elements reported in deeper domains (known as Olympic Dam Deeps),
which run along the base of the deposit, are estimated using OK.

A large number of other unclassified elements are estimated in various ways for
use in assessment of economic elements, gangue elements, and gangue minerals
that may impact processing.

Validation of the Mineral Resource estimate has been conducted in several ways,
including but not limited to, visual drill hole section and plan data comparison
with the block model and various statistical and swath plot comparisons by
domain and element.

Olympic Dam has a long history of mining and processing and reconciliation with
production data provides confidence in Resource determination.

5.1 Cut-off parameters

A cut-off grade was chosen to reflect reasonable prospects for economic
extraction assuming a bulk underground mining method such as block caving. For
the block cave Mineral Resource, this was a cut-off greater than or equal to
0.35% Cu for any selective mining unit (see Mining Factors), which was based on
internal benchmarking studies combined with potential economic modelling. This
cut-off was used to filter potentially economic blocks from potentially
sub-economic blocks, where any material within the retained selective mining
unit (SMU) was deemed to have reasonable prospects of eventual economic
extraction. As such, zero grade material (in-situ waste material or current or
assumed future sub-level open stopes backfill) was included as internal dilution
to account for the non-selective nature of block caving.

For the UG Sulphide (SLOS), the cutoff grade used was variable between 0.6% Cu
and 1% Cu. There has been no change to the SLOS Mineral Resource from that
reported in the BHP FY26 Annual Report (www.bhp.com).

5.2 Mining factors

The total Olympic Dam Mineral Resource assumes both selective SLOS method and a
bulk underground mining method such as block caving. The UG Sulphide (SLOS) and
UG Sulphide Block Cave (BC) Mineral Resources together account for the majority
of the shallower mineralisation. The remaining mineralisation is insufficient to
warrant ongoing separate reporting of an Open Cut (OC) Mineral Resource and has
been removed.

It is assumed that the SLOS Mineral Resource would be extracted prior to block
caving (with zero grade backfill material replacing mineralisation). Future
mining studies are required and may determine that some areas of the deposit are
more economically amenable to block caving without extraction of the selective
SLOS Mineral Resource component, in which case, some of the SLOS Mineral
Resource may convert to block cave Mineral Resource in future.

                                       
--------------------------------------------------------------------------------
                         BHP | Financial results for the year ended 30 June 2026

A maximum depth threshold of -1,500 m from surface level (~-1400 mRL) for block
caving was applied to the BC Mineral Resource. This threshold was applied based
on benchmarking of deposits of similar style and tenor to account for modifying
factors, such as economic and geotechnical factors relating to the reasonable
prospects for economic extraction of deep block cave mining. Beyond this depth
there are uncertainties on management of geotechnical conditions, heat and
ventilation. Future mining studies may refine these assumptions and
considerations. No depth constraint exists for reporting of the SLOS Mineral
Resource.

For the block caving Smallest Mining Unit (SMU) and potential feasibility,
minimum mining widths and heights were considered. This included an assessment
of grade continuity, relative to potential SMU sizes, to quantitatively
demonstrate the degree of spatial consistency in mineral grade distribution. The
assessment utilised a model regularised to 100 m X by 100 m Y by 200 m Z, where
SMU selection required a minimum of three connected blocks in the XY plane, all
of which needed to be above the nominal economic cutoff. This criterion was
informed by technical studies, internal analysis, and consultation with mining
engineers and caving specialists.

The presence of current or future backfill (such as rockfill, concrete aggregate
fill or paste fill) in any future cave design could present a risk of mud rush
(wet or dry), poor cave propagation, breakages or particle comminution. This
material may act like other in-situ fine geological units (e.g. overburden) or
may have variable properties dependent on backfill formulation. Backfill
material could also act differently under varied seismic or stress conditions.
The Competent Person assumes that prior to any future mining, sufficient mining
controls relating to managing mud rush risks, geotechnical risks, grade
variability (of economic and any potential deleterious elements) would be
established to manage and maintain safe working and extraction practices.

There is no assumption related to potential concurrent caving, cave induced
seismicity or seismic interaction, or distance buffers required for concurrent
SLOS mining. The Competent Person assumes that any future caving would have
optimisation on spatial or temporal mining sequences, with controls established
prior to, during, or post-extraction of caved areas.

The Competent Person assumes that block caving, or other bulk underground mining
methods, could occur in the presence of backfill material. No assumption has
been made regarding the impact of non-homogeneous cave flow on the distribution
or forecasting of economic or deleterious elements or materials. Prior to any
consideration of conversion to Ore Reserves, future studies are required to
understand practical constraints, or absolute limits, of either geotechnical,
metallurgical, or other modifying factors. Due to the uncertainty of caving
where there might be a significant portion of backfill, a nominal limit of
(greater than equal)50% backfill, from current or future SLOS mining, is used to
constrain resource classification to Inferred.

It is expected that future studies and additional information will continue to
refine the Mineral Resource as it relates to modifying factors.

There is no assumption that all or any part of the block cave Mineral Resource
would convert to Ore Reserves with further mining studies required.

5.3 Metallurgical factors

The declared Mineral Resource reports on a 100% basis and does not account for
metallurgical recovery. No assumptions have been made regarding recovery of
by-products other than those reported, and no deleterious elements have been
factored into the reported Mineral Resource.

The declaration of Mineral Resource assumes that any future caving material that
include backfill material (such as rockfill, concrete aggregate fill, paste
fill) would be supported by suitable processing studies and blending strategies.

The block cave mineral resource assumes metallurgical recoveries similar to
current SLOS recoveries. Future studies are required prior to any conversion to
Ore Reserve.

5.4 Environmental factors

The Olympic Dam mine is currently in operation. It is assumed that there would
be sufficient data and studies on any impacts of block caving in terms of
surface disturbance, and appropriate waste, water, material disposal and
management options, prior to commencement of a new mining method. It also
assumes there are reasonable prospects of obtaining all necessary permits and
approvals prior to commencement of a new mining method.

5.5 Moisture and density

Tonnages are estimated on a dry basis using dry bulk density data collected for
every sampled interval of drill holes and domained in accordance with the copper
mineralisation.

Bulk density measurements were collected on all assayed samples using the water
immersion method from core samples at the Olympic Dam core processing
facilities. The majority of fresh Olympic Dam core has very low porosity and
negligible moisture content; therefore, no moisture correction is applied. The
estimation of density is performed using an approach similar to that used for Cu
(MIK-OK or OK).

6 Mineral Resource statement

6.1 Classification

A range of criteria was considered in determining the block cave Mineral
Resource classification, including:

                                       
--------------------------------------------------------------------------------
                         BHP | Financial results for the year ended 30 June 2026

.    Drill hole and data density (i.e. informing samples).

.    Sample and assay confidence.

.    Geological interpretation confidence and, similarly, geological continuity.

.    Grade continuity within mineralisation.

.    Estimation performance through validation.

.    Reasonable prospects for eventual economic extraction.

.    Mining method with appropriate modifying factors.

Comparison to the SLOS Mineral Resource is provided for context where
appropriate. There has been no change to the SLOS Mineral Resource from that
reported in the BHP FY26 Annual Report (www.bhp.com).

Determination of the classification category relating to geological confidence
was undertaken using geological confidence shells (wireframes). These shells
were created as follows:

.    Regular grids, at spacings corresponding to desired confidence, were
     created using RMSP software (Python mining software). Grid spacings were
     increased according to confidence levels.

.    At each grid point, a search was conducted using radii which correspond to
     twice the grid spacing to count the number of drill holes within that
     volume. Doubling the grid spacing ensures that the search volume around
     each grid centroid covers the entire area of influence for that cell and
     its immediate neighbours.

.    Boundaries were generated where the drill hole density transitions between
     classification thresholds, creating 3D shells which reflect increasing
     classification confidence. These shells were manually calibrated in
     Leapfrog Geo (2023.3) with the current drilling database to resolve any
     artefacts and ensure that drilling confidence levels matched expectations.
     The following table provides a summary of parameters used in creating
     geological confidence shells (Table 3) and corresponding nominal drill
     spacings.

Table 3. Summary of spacing requirements for geological confidence for the
Olympic Dam block cave classification

Block cave Resource     Sample drill hole  Grid cell size   Required    Nominal spacing
Classification          search radius (m)       (m)        drill holes        (m)
----------------------  -----------------  --------------  -----------  ---------------
Measured..............               60 m              30            4            <80 m
Indicated.............              120 m              60            3    80 m to 180 m
Inferred..............              180 m              90            2   180 m to 300 m

For comparison, the nominal drilling density applied for SLOS Mineral Resource
classification are 20 m to 35 m for Measured, 35 m to 70 m for Indicated and
70 m to 200 m for Inferred.

Additional requirements for classifying of the block cave Mineral Resource
includes:

.    Minimum SMU comprising three connected 100 m by 100 m regularised blocks in
     the XY plane, with a vertical minimum of 200 m in Z.

.    Maximum depth of ~1,500 m from surface (~-1400 mRL).

.    Grade cut-off greater than or equal to 0.35% Cu for any SMU.

.    Classification limit of Inferred for any SMU with (greater than equal)50%
     backfill (current or future).

The classification is considered appropriate by the Competent Person.

6.2 Relative accuracy / confidence

Olympic Dam has a significant history of SLOS mining and has available
production data for comparative purposes which does not highlight any material
issues. Relative accuracy and confidence have been assessed through validation
of the model outlined above.

The Mineral Resource estimate comprises material categorised as Measured,
Indicated or Inferred Mineral Resource. These categories reflect the accuracy
and confidence as a global estimate.

Further drilling and mining studies will most likely result in changes to both
the Mineral Resource and future mine plans at Olympic Dam.

The Competent Person considers the classification approach and methodologies
applied are appropriate for this deposit.

7 Independent review

A review of the Mineral Resource estimate was undertaken by AMC Consultants in
2024. A review of the resource classification regarding block cave was completed
by AMC Consultants in 2026.

                                     
--------------------------------------------------------------------------------
                         BHP | Financial results for the year ended 30 June 2026

In the Competent Person's opinion, there are no outstanding issues arising from
these reviews that are not being addressed within the Mineral Resource report's
recommendations or included in assumptions outlined in this document.

8 Future work

Further drilling may be undertaken to test the lateral and depth extent of
mineralisation and improve confidence in grade continuity. Further studies are
required to assess modifying factors related to the potential application of
block caving. These may include mine design and sequencing, geotechnical
conditions, backfill interaction, seismicity, heat and ventilation, and
associated economic parameters.

9 Estimation and Reporting of Ore Reserves

The mine plan for the Olympic Dam Ore Reserves is underpinned by a Life of Mine
plan prepared in accordance with BHP requirements. There has been no change to
the Ore Reserves from those reported in the BHP FY26 Annual Report
(www.bhp.com). The following information relates to the reporting of SLOS Ore
Reserves. The newly reported Block Cave Mineral Resource has not been converted
to Ore Reserve. Study work is currently in progress to assess the mining method
and underlying factors.

9.1 Assumptions

9.1.1 Mineral Resources estimate for conversion to Ore Reserves

The relevant resource block model has been used as the basis for mine planning
and conversion to Ore Reserves. The reported SLOS Mineral Resources are
inclusive of Ore Reserves.

The Ore Reserve converts Measured Mineral Resource to Proved Ore Reserve and
Indicated Mineral Resource to Probable Ore Reserve, with the exception of
low-grade stockpiles where the Measured Mineral Resource converts to Probable
Ore Reserve.

9.1.2 Site visits

The Ore Reserve Competent Person has worked on site for four years and acquired
direct operational knowledge of Olympic Dam. There has been continuous
involvement with site teams with the most recent site visit undertaken in June
2025 to visit new underground workings and assess Critical controls.

9.1.3 Study status

Olympic Dam has been in continuous production since 1988 and prepares an annual
Life of Mine plan that supports the Ore Reserve estimate. The modifying factors
underpinning the Ore Reserves have been assessed to an appropriate level of
confidence for an operation with a long life of mine. Projects in later stages
of the mine plan will continue to be refined through future studies and
optimisation. These projects do not materially impact the confidence in the Ore
Reserve estimate.

9.1.4 Cut-off parameters

Olympic dam applies a variable cut-off grade strategy that is informed by a
study. Ore reserves are estimated at a cut-off grade of 1.0-1.7% Cu for UG
Sulphide and (greater than equal) 0.6% Cu for Low grade. UG Sulphide includes
ore from stopes and development, while low-grade and waste is the material from
development.

Mining block-specific cut-off grades exploit the unique geological properties of
each block to produce a relatively consistent ore feed. This seeks to maximise
throughput through a series of surface processing stages. This strategy enables
high-grade material to be targeted in early years of the mine plan. Lower grade
material is then exploited as higher-grade material is depleted.

Price and cost assumptions are used to support a variable cut-off. Operating
costs are inclusive of mining, surface processing, general and administration,
closure, marketing and royalties.

9.1.5 Mining factors

The mining method selected at Olympic Dam is underground SLOS with cemented
aggregate backfill. Paste fill has also been identified as an alternative
backfill strategy, with a paste plant currently under execution. The stopes are
sequentially extracted and progressively backfilled to control maximum
excavation spans and manage stresses in the rock mass.

The conversion of Mineral Resource to Ore Reserve is achieved by creating stope
shapes using manual (engineered stopes) and automated techniques (Stope
Optimiser tools). These stopes are incorporated into a mine schedule and
sequenced considering geotechnical parameters and ventilation constraints, and
operating parameters.

Detailed development and stope designs are generated with mine block specific
cut-off grades and schedules are prepared considering respective mine block
constraints.

The nominal stope mining dimension is 30 m by 30 m in plan, with stope heights
varying according to geotechnical parameters and ground conditions. Stope widths
range from 15 m to 30 m to accommodate irregular orebody geometries. The
development dimensions and profiles vary for different applications but are
typically in the ranges of 5 m by 5 m to 7 m by 7 m.

                                       
--------------------------------------------------------------------------------
                         BHP | Financial results for the year ended 30 June 2026

Overbreak (OB) and underbreak (UB) factors that inform dilution and recovery are
reviewed annually and updated as necessary. Modifying factors are informed
through reconciliation of site performance. They are applied by mine area to
reflect localised geotechnical conditions. Typical planned factors are; UB
tonnage factor: 5-11%, OB tonnage factor: 9-28%, OB grade factor: 47-77%. The
wide range of factors reflects area-specific geotechnical and mining conditions
across the operation. The use of these factors enhances the accuracy and
confidence of the Ore Reserve estimate.

The mine plan includes a new material handling system with new underground
crusher and conveyor to surface, supported by appropriate ventilation raises to
deliver production profile.

Inferred Mineral Resources were considered in the Life of Mine schedule but are
not included in the Ore Reserve estimate. To assess the impact of Inferred
Mineral Resources, revenue attributable to Inferred Resources was removed from
the valuation model while all associated costs were retained. The resulting
valuation generated a positive NPV, demonstrating that the Ore Reserve remains
economically viable without the contribution of Inferred Resources.

9.1.6 Metallurgical factors

The Olympic Dam metallurgical process is well established and has been in
operation since mining commenced in 1988. The integrated processing plant
produces copper cathode, uranium oxide, and gold and silver bullion, while
removing deleterious elements at various stages of the process.

A comprehensive geometallurgical program tests ore from both existing and new
mine areas, with results calibrated against operating plant performance.
Hundreds of samples are collected and tested every year based on the mine areas
identified in medium and long-term mine plans. These samples are combined into
monthly composite samples and assessed using the same characterisation
procedures. Metallurgical recovery factors applied in the mine plan are based on
this data and planned operating conditions for the plant.

Average metallurgical recoveries applied in the Ore Reserve estimate are 94% for
Cu, 65% for U\\3\\O\\8\\, 71% for Au, and 63% for Ag. Recovery assumptions are based on
a combination of operating performance and geometallurgical test work.

9.1.7 Environmental

Environmental performance is managed through a comprehensive Environmental
Protection and Management Program (EPMP), approved by both the Commonwealth and
South Australian governments. Required under the Roxby Downs (Indenture
Ratification) Act 1982 (SA) and associated project approval conditions. The EPMP
provides the framework for managing environmental impacts from operations. It is
reviewed and approved annually by the South Australian Minister for Energy and
Mining, including a reassessment of operational activities, environmental
aspects, and associated impacts. All material governmental approvals, licences
and permits required for current Ore Reserve extraction are in place or expected
to be renewed in the ordinary course of operations. There are no known
environmental issues that materially affect extraction of the declared Ore
Reserves.

The closure plan is reviewed regularly and updated to reflect changes as the
operation has a long life and will be subject to change over the remaining life
of the asset. Appropriate uncertainty has been built into the closure cost
estimate.

In the current closure plan, Tailings Storage Facility (TSF) and EP (Evaporation
Ponds) are planned to be progressively rehabilitated during operations, and
redundant infrastructure will be demolished when practicable. Given the
underground nature of Olympic Dam, most other major closure activities (e.g.,
the closure of operational TSF and EP, infrastructure and general land
rehabilitation) are scheduled to commence at the end of life. Active closure is
planned to take three years, and a 20-year post-closure monitoring and
maintenance period is planned.

9.1.8 Social factors

The Roxby Downs (Indenture Ratification) Act 1982 (SA) provides statutory
authority for an agreement (Indenture) between BHP and the State of South
Australia. Refer to Section 2 Mineral tenement and land tenure for further
details.

The Olympic Dam operation has been subject to multiple Environmental Impact
Statement (EIS) assessments under three separate South Australian and
Commonwealth processes since commencement of operations in 1988. All phases
considered expansion of operations over time and support current operations and
Ore Reserves.

Olympic Dam also holds a range of statutory approvals, licences, permits,
exemptions, registrations, certifications, memberships and leases that enable
Olympic Dam operations and are logged in Olympic Dam's Integrated Management
System.

BHP has a suite of policies and procedures in place that ensure appropriate
consideration and management of any potential community or human rights impacts
of its operations, capital projects and investment decisions (both positive and
negative) in line with public commitments set out in BHP's Human Rights Policy
Statement and Indigenous Peoples Policy Statement.

9.1.9 Infrastructure

The Olympic Dam mine has been in production for more than 35 years. Production
commenced in the northern portion of the orebody and subsequently expanded
south, which underpins a significant part of the Ore Reserves.

The underground mine plan incorporates incremental extension of the truck
haulage network to facilitate production from new mine areas. A new material
handling system, including conveyors to surface, ore passes, and haulage
corridors, is planned to enable material movement from new mine areas.

                                       
--------------------------------------------------------------------------------
                         BHP | Financial results for the year ended 30 June 2026

Underground and surface ventilation raises, supported by refrigeration for
deeper mine areas, are incorporated in the mine plan to facilitate access to new
mine areas.

Current operations utilise Cemented Aggregate Fill method to backfill stopes.
Paste Fill has been selected as an alternative backfill method to support
production in existing and future mining areas. Construction of the paste fill
plant and associated infrastructure supporting the Ore Reserves is in execution.

Surface processing facilities are in place and capital allocation for planned
processing infrastructure upgrades has been incorporated into the Life of Mine
plan.

10 Market and commodity price assumptions

10.1 Cost factors

Capital costs for new infrastructure are derived from the Life of Mine plan and
informed by relevant historical costs and study work where appropriate. Major
capital provisions include significant smelter shutdowns occurring every 6 to 10
years, and planned transition from single stage smelter configuration to twin
stage. Capital estimated includes progressive rehabilitation activities and
final closure costs consistent with ongoing closure planning. Sustaining capital
estimates are based on extensive study work and long-term asset integrity
programs targeting reliability of operations.

Operating cost estimates are derived from first principle models for mining,
processing and General and Administrative costs informed by historical operating
performance, budget forecasts and life of mine planning assumptions.

Transport, marketing and other off-site costs are incorporated in cost
estimations. As Olympic Dam produces final metal products on site, all treatment
costs and refining costs are based on current performance. Government royalties
and applicable taxes have been incorporated into the economic evaluation.

10.2 Revenue factors

Revenue is calculated by applying forecast commodity prices and foreign exchange
rates to the planned production in period, with production estimates reflecting
the applicable metallurgical recovery assumptions. Forecast commodity prices
(copper, uranium, gold and silver) and foreign exchange rates are determined in
accordance with BHP protocols and are used as inputs to the valuation model.

Ore Reserves are based on the Life of Mine plan and use latest BHP forecast
commodity prices forecasts for revenue projection.

The commodity price protocols and the process that establishes them is
commercially sensitive and is not disclosed in this report.

10.3 Market assessment

Olympic Dam is a polymetallic deposit that produces copper cathode, uranium
oxide concentrate, and gold and silver bullion. These products are sold to
various domestic and international markets.

Future copper demand growth is expected to be underpinned by development in
emerging economies as they electrify, industrialise, and urbanise. The global
energy transition provides further upside, as copper is widely used in electric
vehicles and renewable energy infrastructure.

Currently, the copper market is broadly balanced; however, demand is expected to
exceed committed supply in the coming years, requiring new supply to come to
market.

Nuclear power generation, and associated uranium demand, are expected to grow in
the future, requiring new sources of supply.

Unlike most industrial metals, gold and silver prices are influenced not only by
physical supply-demand balances but also by investment flows, monetary
conditions, and safe-haven demand.

10.4 Economics

A valuation model has been developed for the purposes of supporting the Ore
Reserves. All revenue and economic assumptions are as described within other
sections of this table. Calculation of the net present value (NPV) was conducted
using a discount rate, estimated inflation and tax rates adhering to BHP
protocols.

Sensitivity analysis was conducted on the mine plan using a range of prices,
exchange rates and costs, demonstrating a positive NPV across all sensitivities.

Inferred Mineral Resources were allowed to contribute to the mine schedule but
are not included in the Ore Reserves estimate. Sensitivity analysis was also
conducted on the mine plan by removing revenue attributable to Inferred
Resources while retaining all associated costs. The analysis demonstrates that
Inferred Resources make a minor contribution and that the NPV remains positive
following its removal.

                                       
--------------------------------------------------------------------------------
                         BHP | Financial results for the year ended 30 June 2026

11 Ore Reserve statement

There have been no changes to Ore Reserves since those reported in BHP's FY26
Annual Report. The Ore Reserve estimate is supported by a Life of Mine plan,
operating performance, modifying factors and assumptions previously disclosed.

11.1 Classification

The Ore Reserve classification is supported by the SLOS Mineral Resource
classification. Measured Mineral Resources are converted to Proved Ore Reserves
and Indicated Mineral Resources are converted to Probable Ore Reserves, except
for low-grade development material, where Measured Mineral Resources are
converted to Probable Ore Reserves. The low-grade material mined at a cut-off
grade of 0.6% Cu will be stockpiled to process towards end of life of mine.
Other than low-grade stockpiles, no Probable Ore Reserves have been derived from
Measured Mineral Resources.

11.2 Discussion of relative accuracy/confidence

The relative accuracy and therefore confidence in the Ore Reserves estimate is
deemed appropriate for its intended purpose of global Ore Reserves reporting.
The application of modifying factors affecting the accuracy and confidence as
stated in Section 9 Estimation and reporting of Ore Reserves are taken into
consideration during classification of the model and are therefore addressed by
the Competent Person in the attributed Reserve classification.

Confidence in the Ore Reserve estimate is supported by ongoing production
reconciliation, operational performance and validation of modifying factors
through established mining operations. In the Competent Person's opinion, there
is appropriate confidence in the modifying factors to support the Olympic Dam
Ore Reserve estimate.

11.3 Ore Reserves declared

Table 2 presents the statement of Ore Reserves for Olympic Dam and is unchanged
from that reported in BHP's FY26 Annual Report (www.bhp.com).

12 Reconciliation

Confidence in the Ore Reserve is supported through reconciliation against
production data. Annual reconciliation results are considered more
representative than shorter reporting periods due to timing differences
associated with ore movement through stockpiles and processing facilities.
Reconciliation performance provides confidence in the modifying factors and
assumptions applied in the Ore Reserve estimate.

13 Independent review

AMC Consultants conducted independent reviews of the 2019 and 2020 Ore Reserve
processes and estimates, which informed the FY2021 Ore Reserves. All actions
were closed in 2021, with no further findings for Olympic Dam. Since completion
of external reviews, there have been no material changes to the ore reserve
estimates that would warranted external independent review. BHP's internal
annual assurance program further ensures that any significant risks, assumptions
and controls relevant to Ore Reserve estimate are adequately managed.

14 References

Joint Ore Reserves Committee of The Australasian Institute of Mining and
Metallurgy, Australian Institute of Geoscientists and Minerals Council of
Australia (JORC), 2012. Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves.

BHP Quarterly Activities Report, 18th Jan 2024 "Operational review for the half
year ended 31 December 2023". Appendix 3, Project status update - Olympic Dam
"Deeps" (OD Deeps). www.bhp.com

                                       
--------------------------------------------------------------------------------
                         BHP | Financial results for the year ended 30 June 2026

Variance analysis relates to the relative performance of BHP and/or its
operations during the three months ended September 2026 compared with the three
months ended September 2025, unless otherwise noted. Production volumes, sales
volumes and capital and exploration expenditure from subsidiaries are reported
on a 100% basis; production and sales volumes from equity accounted investments
and other operations are reported on a proportionate consolidation basis.
Numbers presented may not add up precisely to the totals provided due to
rounding. Medium term refers to a five-year time horizon, unless otherwise
noted.

The following abbreviations may have been used throughout this release: silver
(Ag); gold (Au); billion dollars (B/bn); billion troy ounces (Boz); billion
tonnes (Bt); cost and freight (CFR); cost, insurance and freight (CIF); carbon
dioxide equivalent (CO2-e); compound annual growth rate (CAGR); copper (Cu);
copper equivalent (CuEq); dry metric tonne (dmt); final investment decision
(FID); free on board (FOB); foreign exchange (FX); greenhouse gas (GHG); grams
per tonne (g/t); high-potential injury (HPI); joint venture (JV); kilograms per
tonne (kg/t); kilometre (km); megalitres/million litres (ML); Memorandum of
Understanding (MOU); million troy ounces (Moz); million ounces per annum
(Mozpa); million pounds (Mlb); million tonnes (Mt); million tonnes per annum
(Mtpa); ounces (oz); pounds (lb); million dollars (M); thousand ounces (koz);
thousand ounces per annum (kozpa); thousand tonnes (kt); thousand tonnes per
annum (ktpa); thousand tonnes per day (ktpd); tonnes (t); total recordable
injury frequency (TRIF); uranium (U); wet metric tonnes (wmt) and year-to-date
(YTD).

In this release, the terms `BHP', the `Group', `BHP Group', `we', `us', `our'
and `ourselves' are used to refer to BHP Group Limited and, except where the
context otherwise requires, our subsidiaries. Refer to Note 28 - Subsidiaries of
the Financial Statements in the BHP Annual Report 2026 for a list of our
significant subsidiaries. Those terms do not include non-operated assets.
Notwithstanding that this release may include production, financial and other
information from non-operated assets, non-operated assets are not included in
the BHP Group and, as a result, statements regarding our operations, assets and
values apply only to our operated assets unless stated otherwise. Our
non-operated assets include Antamina, Resolution, Samarco and
Vicuna. BHP Group cautions against undue reliance on any forward-looking
statement or guidance in this release. These forward-looking statements are
based on information available as at the date of this release and are not
guarantees or predictions of future performance and involve known and unknown
risks, uncertainties and other factors, many of which are beyond our control and
which may cause actual results to differ materially from those expressed in the
statements contained in this release.

Further information on BHP can be found at bhp.com

Authorised for lodgement by:
Stefanie Wilkinson
Group Company Secretary

Sponsor: J.P. Morgan Equities South Africa Proprietary Limited  

Media Relations                                   Investor Relations

Email: media.relations@bhp.com                    Email: investor.relations@bhp.com

Australia and Asia                                Australia and Asia

Gabrielle Notley                                  John-Paul Santamaria
+61 411 071 715                           	  +61 499 006 018

Europe, Middle East and Africa                    Europe, Middle East and Africa

Sinead Keller                                     Adam Sanderson
+44 7816826 169                           	  +44 7884 735 515

Americas                                          Americas

Renata Fernandez                                  Li Hua
+56 9 8229 5357                           	  +1 647 828 9830

BHP Group Limited ABN 49 004 028 077

LEI WZE1WSENV6JSZFK0JC28

Registered in Australia

Registered Office: Level 18, 171 Collins Street

Melbourne Victoria 3000 Australia

Tel +61 1300 55 4757 Fax +61 3 9609 3015

BHP Group is headquartered in Australia
Follow us on social media
[LOGO]

                                       
--------------------------------------------------------------------------------
                         BHP | Financial results for the year ended 30 June 2026
Date: 20/10/2026 09:20:00
Produced by the JSE SENS Department. The SENS service is an information dissemination service administered by the JSE Limited ('JSE'). 
The JSE does not, whether expressly, tacitly or implicitly, represent, warrant or in any way guarantee the truth, accuracy or completeness of
the information published on SENS. The JSE, their officers, employees and agents accept no liability for (or in respect of) any direct, 
indirect, incidental or consequential loss or damage of any kind or nature, howsoever arising, from the use of SENS or the use of, or reliance on,
information disseminated through SENS.