Eastern Platinum Updated Technical Report on The Crocodile River Mine

EASTERN PLATINUM LIMITED
(Incorporated in Canada)
(Canadian Registration number BC0722783)
(South African Registration number 2007/006318/10)
Share Code TSX: ELR ISIN: CA2768555096
Share Code JSE: EPS ISIN: CA2768555096
(“Eastplats” or the “Company”)

May 20, 2022
Trading Symbol: ELR (TSX); EPS (JSE)

                                                      NEWS RELEASE

 EASTERN PLATINUM FILES UPDATED TECHNICAL REPORT ON THE CROCODILE RIVER MINE

May 20, 2022, Vancouver, British Columbia – Eastern Platinum Limited (“Eastplats” or the “Company”) is
pleased to announce that it has filed the “NI 43-101 Technical Report on the Crocodile River Mine (“CRM”),
North West Province, South Africa” (the “Report”) dated January 1, 2022 on SEDAR. The CRM is a
platinum group metal (“PGM”) mine located 70 km north-northwest of Johannesburg in the North West
Province and 7 km south of the town of Brits and situated on the western limb of the Bushveld Igneous
Complex in an area of known structural complexity, the Brits Graben. The current mine lease area includes
one operating mining section (the “Zandfontein Section”) and two development sections (the “Crocette
Section” and the “Kareespruit Section”, respectively).

The Report has been updated, in preparation of the re-start of underground mining at the Zandfontein
Section of CRM which was placed under care and maintenance in 2013. The resources and reserves
updates of the Report apply to each of the Zandfontein Section, the Crocette Section and the Kareespruit
Section.

In connection with the filings, the Company is pleased to provide a statement of the current resources and
reserves supported by the Report. Capitalized terms used and not otherwise defined in this news release
have the meaning ascribed to them by The Canadian Institute of Mining, Metallurgy and Petroleum.

Zandfontein underground (the project) M&I resource is 28Mt with 3.96Moz and a reserve of 14.58Mt
with 1.72Moz for the current project plan of 22 years.

The resources are effective as of January 1, 2022. The following table presents the Measured and Indicated
Mineral Resource for underground:

                  Mineral          Geo Loss            Mine
                                                              4E     Pt     Pd     Rh     Au      4E Content
  Mine Area      Resource           Tonnes             Cut
                   Class               Kt               m      g/t    g/t    g/t    g/t    g/t     kg      Moz
 Crocette                            3,646             1.86   3.71   2.30   1.01   0.37   0.03   13,516    0.43
             Measured
 Zandfontein                         6,688             1.66   4.85   3.01   1.33   0.48   0.04   32,463    1.04
      Grand Total                   10,335             1.73   4.45   2.76   1.22   0.44   0.03   45,979    1.48
 Crocette                            7,087             1.84   3.70   2.29   1.01   0.36   0.03    26,197   0.84
 Zandfontein Indicated              21,371             1.56   4.24   2.63   1.16   0.42   0.03    90,636   2.91
 Kareespruit                        25,243             1.74   4.01   2.49   1.09   0.40   0.03   101,142   3.25
      Grand Total                   53,701             1.68   4.06   2.52   1.11   0.40   0.03   217,975   7.01
 Crocette                           10,733             1.85   3.70   2.30   1.01   0.36   0.03    39,712   1.28
 Zandfontein   M&I                  28,059             1.59   4.39   2.72   1.20   0.43   0.03   123,099   3.96
 Kareespruit                        25,243             1.74   4.01   2.49   1.09   0.40   0.03   101,142   3.25
      Grand Total                   64,036             1.69   4.12   2.56   1.13   0.41   0.03   263,954   8.49

Notes:
 1. Mineral Resource Cut-off of 1.7 g/t 4E applied.
 2.   Columns may not add up due to rounding.
 3.   Mineral Resources are stated as inclusive of Mineral Reserves.
 4.   Mineral Resources are reported as total Mineral Resources and not attributed.

The following table shows the Inferred Mineral Resource:
                   Mineral      Geo Loss Tonnes           Mine Cut     4E      Pt       Pd     Rh      Au             4E
  Mine Area       Resource
                    Class                kt                  m         g/t     g/t      g/t    g/t     g/t       kg        Moz
 Crocette                                32                 1.62      3.91    2.43     1.07    0.39    0.03      124        0.00
 Zandfontein   Inferred                22,550               1.46      4.45    2.76     1.22    0.44    0.03    100,390      3.23
 Kareespruit                           57,992               1.65      4.16    2.58     1.14    0.41    0.03    241,484      7.76
       Grand Total                     80,573               1.60      4.24    2.63     1.16    0.42    0.03    341,998     11.00

Notes:
 1. Mineral Resource Cut-off of 1.7 g/t 4E applied.
 2. Columns may not add up due to rounding.
 3. Mineral Resources are stated as inclusive of Mineral Reserves.
 4. Mineral Resources are reported as total Mineral Resources and are not attributed.

The individual Pt, Pd, Rh and Au values are based on the prill split derived from the composited individual
channel grades of the drillholes. The prill split for underground is presented in the table below.

        4E              Unit        New 4E       Historic 4E         6E              Unit        Historic 6E          New 6E
Pt                       %           62.05%        61.87%            Pt               %            50.31%              50.46%
Pd                       %           27.32%        27.25%            Pd               %            22.16%              22.22%
Rh                       %           9.86%         10.42%            Rh               %            8.47%                8.02%
Au                       %           0.77%         0.47%             Au               %            0.38%                0.63%
4E                       %          100.00%       100.00%            Ru               %            3.68%                3.68%
                                                                      Ir              %            15.00%              15.00%
                                                                     6E               %           100.00%             100.00%

The TSF (as defined below) Mineral Resources are stated as at January 1, 2022, at no cut-off as all the
material will be processed is tabled in the following table:

                                   Tonnes         3E         Pt      Pd       Rh       Au     Cr2O3     FeO     Cr2O3       FeO
   Mineral Resource Class
                                      kt          g/t       g/t      g/t      g/t      g/t      %        %        kt         kt
 Measured                            4,594         1.17     0.71     0.29    0.17     0.01     19.54   15.16      898        697
 Indicated                           1,049         1.14     0.69     0.29    0.17     0.01     19.21   15.03      202        158
 Total in Model                      5,643         1.16     0.70     0.29    0.17     0.01     19.48   15.14    1,099        854
 Reworked Added (Indicated)          1,545         1.18     0.72     0.30    0.17     0.01     18.50   14.50      286        224
 Total Measured                      4,594         1.17     0.71     0.29    0.17     0.01     19.54   15.16      898        697
 Total Indicated                     2,594         1.16     0.71     0.29    0.17     0.01     18.79   14.71      487        382
 Total TSF                           7,188         1.17     0.71     0.29    0.17     0.01     19.27   15.00    1,385      1,078

The Mineral Reserve estimate for the CRM underground operations as at January 1, 2022 is detailed in the
table below:

     Mineral                Delivered Tonnes                           4E Grade                                4E Content
    Reserve
    Category                          kt                                    g/t                        kg                       koz
 Proved                               2,282                                 4.75                     10,829                     348
 Probable                            12,298                                 3.48                     42,777                   1,375
 Total                               14,580                                 3.68                     53,605                   1,723

Notes:
    1.   The Mineral Reserve estimation includes only diluted Measured and Indicated Mineral Resources which have been
         converted to Proved and Probable Mineral Reserves.
    2.   A portion of Inferred Mineral Resources are included in the LoM plan, as it is required to mine through Inferred portions to
         access Measured and Indicated Mineral Resources. These Inferred Mineral Resources have, however, been excluded in
         the Mineral Reserve estimation and in the economic analysis.
    3.   No Inferred Mineral Resources have been included in the Mineral Reserve estimation.
    4.   The Mineral Reserve estimation was completed using a 4E basket price of USD1,825/oz and exchange rate of 15.53
         ZAR/USD.
    5.   An uneconomical tail of 133.34 kt at a 4E grade of 3.51 g/t, containing 15.06 koz has been excluded from the Mineral
         Reserve estimate.
    6.   The Mineral Reserves are reported as total Mineral Reserves and are not attributed.

The Mineral Reserve estimate for the CRM TSF Re-mining operation as at January 1, 2022 is detailed in
the table below:

 Mineral Reserve        Tonnes        4E Grade                4E Content                    Cr?O? Content          Cr?O? Grade
     Category             kt             g/t                kg           koz                      kt                   %
 Probable                 7,570            1.10                 8,345       268                      1,371                18.12

Notes:
    1.   The Mineral Reserve estimation includes only diluted Measured and Indicated Mineral Resources which have been
         converted to Probable Mineral Reserves.
    2.   No Inferred Mineral Resources have been included in the Mineral Reserve estimation.
    3.   The Mineral Reserve estimation was completed using a 4E basket price of USD2,305/oz, and calculated Chrome price
         (as per offtake agreement) of USD106/t and exchange rate of 15.53 ZAR/USD.
    4.   Chrome ore produced from the re-mined tailings is sold on a cost-plus basis, considering the TSF remining costs,
         processing cost and chrome logistics costs and an additional allowance for certain overheads.
    5.   The Mineral Reserve excludes PGMs and Chrome Oxide from the TSF already re-mined since December 2018.
    6.   The Mineral Reserves are reported as total Mineral Reserves and are not attributed.

Full details of the methodology used in the estimation of reserves and resources, along with details of the
mining operations at CRM are provided in the Report filed on SEDAR.

Based on the updated resources and reserves, the planned re-start project at the underground mine at
CRM will focus on the Zandfontein Section (the “Planned Project”).

This is a robust project based on a hybrid mining method that was selected from the trade-off study
conducted in 2021. This mining method was selected considering the geological complexity of the
Zandfontein orebody and the requirements for the selection of a suitable, technically and economically
viable mining method. The hybrid mining method is well suited to the orebody and allows for minimum off-
reef development. The mine plan is practical and a production ramp up to steady state production volumes
has been planned.

The study was conducted on a “standalone underground” operation, as well as an “including the remining
and processing of the Tailings Storage Facility (“TSF”)” operation.
The Planned Project Highlights (all amounts in USD unless specified)

Net Present Value (“NPV”) of approximately $188.0 million excluding the TSF and $202.0 million including
the TSF, based on the following parameters:

            o   at 11.87% discount rate using a life of mine (“LoM”) long term 4E PGM basket price and
                calculated chrome price as per the offtake agreement;
            o   the exchange rate utilized for the conversion to USD is R15.53; and
            o   LoM: 1.51 million 4E oz of commercial production over 22 years.

The following table presents a range of values based on various discount rates:

                                                 Excluding    Including
                             Item        Unit                              TSF
                                                   TSF           TSF
                          NPV@0%        USDm         494        509         15
                          NPV@5%        USDm         313        328         15
                          NPV@10%       USDm         214        228         14
                         NPV@11.9%      USDm         188        202         14
                          NPV@15%       USDm         154        167         13
                          NPV@20%       USDm         115        127         12

    •   Non-sustaining capital costs of $21 million, which includes a 15% contingency applied to capital
        expenditure estimates with a Total All-In Costs of $1,537 per 4E oz with a contingency of 20%
        applied to mining operating costs, and 10% applied to the processing and other costs, in line with
        estimate accuracies.

    •   Payback period of 2.0 years including the TSF.

Diana Hu, President, Chief Executive Officer, and Director of Eastplats commented, “Now the Company
will embark on securing the required funding to get the Zandfontein underground mining restarted in 2022.”

Technical Report and Qualified Person

The Report has been filed on SEDAR and on Eastplats’ website today. The Report has been prepared
under the supervision of the following individuals, each of whom is independent of the Company and is a
Qualified Person as defined within the meaning of National Instrument 43-101 - Standards of Disclosure for
Mineral Projects:

    •   Daniel (Daan) van Heerden, BEng (Min.), MCom (Bus. Admin.), MMC Pr. Eng., FSAIMM, AMMSA,
        Director of Minxcon (Pty) Ltd.

    •   Uwe Engelmann, BSc (Zoo. & Bot.), BSc Hons (Geol.), Pr.Sci.Nat., MGSSA, Director of Minxcon
        (Pty) Ltd.

    •   Johan Odendaal, BSc (Geol.), BSc Hons (Min. Econ.), MSc (Min. Eng.), Pr.Sci.Nat., FSAIMM,
        MGSSA, Director of Minxcon (Pty) Ltd.

The technical information in this news release was reviewed and approved by Daan van Heerden, Uwe
Engelmann and Johan Odendaal who are Qualified Persons as defined by NI 43-101.

The technical report and all supporting documents are available for download at
https://eastplats.com/investors-2/reports/.

About Eastern Platinum Limited

Eastplats owns directly and indirectly a number of PGM and chrome assets in the Republic of South Africa.
All of the Company’s properties are situated on the western and eastern limbs of the Bushveld Complex,
the geological environment that hosts approximately 80% of the world’s PGM-bearing ore.

Operations at the Crocodile River Mine currently include re-mining and processing of its tailings resource
to produce PGM and chrome concentrates from the Zandfontein tailings dam.

For further information, please contact:
 EASTERN PLATINUM LIMITED
 Wylie Hui, Chief Financial Officer and Corporate Secretary
 whui@eastplats.com (email)
 (604) 800-8200 (phone)

Cautionary Statement Regarding Forward-Looking Information
This press release contains “forward-looking statements” or “forward-looking information” (collectively referred to herein
as “forward-looking statements”) within the meaning of applicable securities legislation. Such forward-looking
statements include, without limitation, forecasts, estimates, expectations and objectives for future operations that are
subject to a number of assumptions, risks and uncertainties, many of which are beyond the control of the Company.
Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by
the words “will”, “plan”, “intends”, “may”, “could”, “expects”, “anticipates” and similar expressions. Further disclosure of
the risks and uncertainties facing the Company and other forward-looking statements are discussed in the Company’s
most recent Annual Information Form available under the Company’s profile on www.sedar.com.

In particular, this press release contains, without limitation, forward-looking statements pertaining to: highlights of the
Crocodile River Mine Technical Report including expected costs of the project and the life of the mine, the ore tonnes
and waste tonnes to be produced over the life of the mine; the delivered 4E content during the life of the mine, the
valuation estimates, and the ability of the Company to secure further funding. These forward-looking statements are
based on assumptions made by and information currently available to the Company. Although management considers
these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect. By
their very nature, forward-looking statements involve inherent risks and uncertainties and readers are cautioned not to
place undue reliance on these statements as a number of factors could cause actual results to differ materially from
the beliefs, plans, objectives, expectations, estimates and intentions expressed in such forward-looking statements.
These factors include, but are not limited to, unanticipated problems that may arise in the Company’s production
processes, commodity prices, lower than expected grades and quantities of resources, need for additional funding and
availability of such additional funding on acceptable terms, economic conditions, currency fluctuations, competition and
regulations, legal proceedings and risks related to operations in foreign countries.

All forward-looking statements in this press release are expressly qualified in their entirety by this cautionary statement,
the “Cautionary Statement on Forward-Looking Information” section contained in the Company’s most recent
Management’s Discussion and Analysis available under the Company’s profile on www.sedar.com. The forward-
looking statements in this press release are made as of the date they are given and, except as required by applicable
securities laws, the Company disclaims any intention or obligation, and does not undertake, to update or revise any
forward-looking statements, whether as a result of new information, future events or otherwise.

This press release may include certain terms or performance measures commonly used in the mining industry that are
not defined under International Financial Reporting Standards (“IFRS”) as issued by the International Accounting
Standards Board, which is incorporated in the CPA Canada Handbook. The Company believes that, in addition to
conventional measures prepared in accordance with IFRS, certain investors use this information to evaluate the
Company’s performance. Any such data presented is intended to provide additional information and should not be
considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS.
No stock exchange, securities commission or other regulatory authority has approved or disapproved the
information contained herein.

The Company has a primary listing on the Toronto Stock Exchange and a secondary listing on the JSE
Limited.

JSE Sponsor
PSG Capital

Date: 20-05-2022 08:45:00
Produced by the JSE SENS Department. The SENS service is an information dissemination service administered by the JSE Limited ('JSE'). 
The JSE does not, whether expressly, tacitly or implicitly, represent, warrant or in any way guarantee the truth, accuracy or completeness of
 the information published on SENS. The JSE, their officers, employees and agents accept no liability for (or in respect of) any direct, 
indirect, incidental or consequential loss or damage of any kind or nature, howsoever arising, from the use of SENS or the use of, or reliance on,
 information disseminated through SENS.

Share This Story